HomeMy WebLinkAbout245920_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10197721 ACC PROJECT ADDRESS: 3392 S Bristol St PLAN CHECK ENGINEER: Mazarji, ZacTEL:714 647-5831FAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 9/17/2018 Roof equipment. INITIAL REVIEW 9/28/2018 EXPIRATION 3/16/2019 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Conor Beck 3. TEL: (949)267-1660 FAX: VALUATION:$5,000.00 EMAIL: cbeck@adcollaborative.com FLOOD ZONE:X-0602320259J APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5831for an appointment, if needed.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information and submittal requirements. The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (714-647-5804.) Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (714-647-5840) Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSubmit structural calculations by California licensed architect or registered civil engineer for new roof screening and show location on the roof plan. Indicate the weight of each equipment on Sheet SD4.3. Show missing weight of RTU of 250LB.Reference Sheet 5 of structural calculations and Sheet SD4.3, Please clarify discrepancy for calling 5-1/8x18 beams as new or existing and submit structural for design and justification for existing or new beam due to additional equipment load.Reference detail 6, Sheet S1, please refer to structural drawings to show correct landing for new ramp at door landing. The floor or landing shall be not more than ½” lower than the threshold of the doorway. Reference detail 1, Sheet S1, indicate weight of each new equipment per structural calculations. Subject to inspection by City inspector.