HomeMy WebLinkAbout246009_3_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10197747
PROJECT ADDRESS:
2513 W Harvard St
PLAN CHECK ENGINEER:
Ahangian, KathyTEL:714
647-5812FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
9/19/2018
INITIAL REVIEW
9/30/2018
EXPIRATION
3/18/2019
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Hung Le
3.
TEL:
(562)412-1818
FAX:
(562)868-2128
VALUATION: $116,480.00
EMAIL:
le_hung4946@yahoo.com
FLOOD ZONE: X-0602320257J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2016 California Residential Code (CRC); 2016 California Building Code (CBC); CMC = 2016 California Mechanical Code; CPC = 2016 California Plumbing Code; CEC = 2016 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.
Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees.
All drawings and supporting documents shall be prepared, stamped, and signed by a California licensed architect or registered professional engineer. (CRC R301.1.3, CBC 107.1 and 107.3.4.1).All persons preparing plans for others shall sign those plans. Business and Professions Code Chapter 3, Division 3, Section 5536.1 (a).
This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
-Public Works Agency approval (647-5039).
- Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
- School District Compliance Certificate; and a copy of the building permit application, signed by
the plan check engineer, shall be required by the School District to verify the scope of the work.
Specify finish floor elevation of first floor. (CBC 107.2.5)Shower compartments and walls above bathtubs with shower heads installed shall be finished with a smooth, nonabsorbent surface to a height of not less than 72” above the floor. (CRC R307.2)Glass enclosure doors and panels must be labeled Category II. Swing door outward. Net area of shower receptor shall be not less than 1,024 sq. in. of floor area, and encompass 30-inch diameter circle. (CPC411.7)Glazing in swinging, sliding, and bifold doors 9 square feet or less shall be a minimum category classification of I (CPSC 16 CFR 1201) and II (CPSC 16 CFR 1201) when more than 9 square feet or sliding. (Table R308.3.1 (1), R308.3 (1)) Callout attic vent locations, sizes and types on plans. Provide attic ventilation calculation to show minimum ventilation is provided. (CRC R806.2)Draftstops shall be provided in any concealed space where there is usable space both above and below the concealed space. The concealed space shall not exceed 1,000 square feet. (CRC R302.12) Show exterior wall construction assembly. A minimum of one layer of No. 15 asphalt felt, free from holes and breaks, complying with ASTM D 226 for Type 1 felt shall be applied over studs of all exterior walls. Specify that two layers of Grade D or 60 minute Grade D paper shall be applied over all wood base sheathing. (CRC R703.2)
Provide a minimum of two No. 4 bars at top and at bottom of continuous footing.
The City has encountered a large number of inspection problems arising from a lack of specific framing details. The following listed items are required to be shown on the plans (CBC 107.1):
- All plumbing walls are to be framed with a minimum of 6" studs.
- Header and trimmer details for doors and windows are to be shown with full length trimmers,
specifying the size of the header and trimmer. (2308.10.4.3)
Clearly identify all design assumptions & load criteria on the plans. As a minimum:
- Dead Loads of roof/ceiling, floors, exterior/interior walls (R301.2.2.2.1);
- Live Loads for roof, attics with limited storage, attics without storage, habitable attics and attics
served with fixed stairs, floors, and balconies/decks, and stairs per Tables R301.5 & R301.6;
- Wind Loads per Section R301.2.1and wind exposures per Section R301.2.1.5;
- Seismic Loads per Section R301.2.2;
- Local Jurisdiction Design Criteria per Table R301.2(1)
Call out anchor bolt size and spacing on foundation plan. Provide 1/2" diameter embedded 7" minimum at 6' o.c. maximum spacing (4' o.c. for 2 stories). CRC R403.1.6
The residence shall conform to the State Energy Conservation Standards. Submit forms and calculations for review and blueprint the final forms on the plans.
- Signed Energy Efficiency Documents must be printed on the plans.
- Also, submit 2 copies of signed Energy Efficiency calculations.
- The corrected/final drawings shall have the required energy efficiency compliance documentation
with completed signature blocks filed on the plans.
- Refer to the attached public handouts titled “Energy Efficiency Compliance” and “Energy
Efficiency Compliance Documentation”.
- Clarify location and size of all existing and new windows on the drawings. Revise T-24
energy calculations to show compliance.
Note on the drawings, ventilation heating and air conditioning system shall have MERV 6 filters or better. Additions and alterations are required to comply with 2016 CESC Section 152. Submit an energy complete performance analysis. (T24-1-10.103) All new windows and doors shall have a label indicating the U-factor and SHGU. Comply with energy documentation requirements.Revise framing plans to indicate insulation for walls R=, ceiling R= , climate zone 8. (2016 CESC 150) On detail 11/SD1 , calculation call 6-16D nail for roof rafter to ceiling joist connection, please revise it accordingly.Concrete strength on sheet S1 is 4500 Psi , which required special inspection , please revise it.Please fillout attached SB-407 and copy it on the drawings.