Loading...
HomeMy WebLinkAbout248374_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10198438 PROJECT ADDRESS: 2931 S Main St Unit# E PLAN CHECK ENGINEER: Chehade, NabilTEL:714 647-5848FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 11/21/2018 INITIAL REVIEW 1/23/2019 EXPIRATION 5/20/2019 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Jorge Uriarte 3. TEL: (714)496-9977 FAX: VALUATION:$1,000.00 EMAIL: gnsgreen@gmail.com FLOOD ZONE:X-0602320278J APPLICABLE CODE: 2016CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5848 for an appointment.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. -- Police Department approval on the corrected/final set of drawings (647-5840)For both spaces the path of travel to the area of remodel and the bathrooms serving the area of remodel need to comply with the accessibility requirements. Provide notes and details to show compliance.Specify the exact intended use of the show room and the shop/warehouse area in order to evaluate if a 1-hr wall construction is required between the two spaces.Provide an occupant load analysis from each space.