HomeMy WebLinkAbout246351_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10197855
PROJECT ADDRESS:
2 E Hutton Center Dr Unit# 204
PLAN CHECK ENGINEER:
Chehade, NabilTEL:714
647-5848FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B, SPK
OCCUPANCY CLASSIFICATION(S):
A-3
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
9/27/2018
INITIAL REVIEW
11/29/2018
EXPIRATION
3/26/2019
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Ken Youn
3.
TEL:
(213)820-9104
FAX:
VALUATION:$63,758.00
EMAIL:
info@uldla.net
FLOOD ZONE:X-0602320278J
APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5848 for an appointment.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714)573-6100)
- Public Works Agency approval (647-5039)
- County of Orange Health Department approval on the corrected/final set of drawings ((714)433-6000)When two exits are required, they need to be separated by 1/3 of the diagonal of the area served.Occupants cannot exit through through a kitchen or a storage area.Please note the occupant load is based on the area of the dining room and the length of fixed seats and not the number of tables.Specify the type of construction and occupancy group in addition to whether the building is sprinklered on plans.Specify on first sheet of plans the scope of work under this project.