Loading...
HomeMy WebLinkAbout247403_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10198155 PROJECT ADDRESS: 1061 E Fourth St PLAN CHECK ENGINEER: Chehade, NabilTEL:714 647-5848FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): UnKnown PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 10/25/2018 INITIAL REVIEW 11/5/2018 EXPIRATION 4/23/2019 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Joe Rodriguez 3. TEL: (714)914-8896 FAX: VALUATION:$3,000.00 EMAIL: jrodsta31@hotmail.com FLOOD ZONE:X-0602320276J APPLICABLE CODE: 2016CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5848 for an appointment.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (647-5840)Specify the type of construction and occupancy group on first sheet of plans; please specify if the building has a sprinkler system.What is the note regarding the “ PV” under the permitting and Planning section.Revise the scope of work to show the screen as a part of this project. If it is existing please indicate so on the plans. Structural calcs are required for the screen if it is new.ovide details to match the calcs. Screen plans, should be signed and stamped by the design engineer.