HomeMy WebLinkAbout246914_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10198005 PROJECT ADDRESS: 200 3/4 W Santa Ana Blvd Unit# WCC01 PLAN CHECK ENGINEER: Chehade, NabilTEL:714 647-5848FAX:714 647-5897 TYPE OF CONSTRUCTION: N/A OCCUPANCY CLASSIFICATION(S): N/A PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 10/11/2018 INITIAL REVIEW 11/27/2018 EXPIRATION 4/9/2019 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Matthew Yang 3. TEL: (310)744-5854 FAX: VALUATION:$28,000.00 EMAIL: sprintmods@tangent.systems FLOOD ZONE:X-0602320276J APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The configuration of the braces and the dimensions of the screen enclosure as shown on the architectural plans is different from what is provided in the calcs. Please revise and provide similar dimensions.Either the architect of record or the design engineer (who prepared the calcs) must sign the plans.Specify the ESR number for the anchor bolts proposed. ESR number should be provided on plans.Specify the type of construction of the building and whether the building is sprinklered.Please note that any material attached to the building has to comply with the requirements for the specific type of construction. (please provide all the information required including any ICC approvals for the product and your analysis of why it complies with the building type of construction.)Clarify if the equipment boxes are enclosed on all sides or just the front.Plans are approved and are left at the counter. Please note that clearance from planning and public works will be required prior obtaining the permit.