PLAN CHECK NO:
10198911
PROJECT ADDRESS:
4221 1/2 W Roberts Dr
PLAN CHECK ENGINEER:
Chehade, NabilTEL:714
647-5848FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
1/15/2019
INITIAL REVIEW
4/1/2019
EXPIRATION
7/14/2019
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Loc Ly
3.
TEL:
(714)657-2765
FAX:
VALUATION: $71,395.00
EMAIL:
locly1000@yahoo.com
FLOOD ZONE:
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2016 California Residential Code (CRC); 2016 California Building Code (CBC); CMC = 2016 California Mechanical Code; CPC = 2016 California Plumbing Code; CEC = 2016 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5848 for an appointment.
This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
-Police Department approval on the corrected/final set of drawings (647-5840).
-Public Works Agency approval (647-5039).
-Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
- School District Compliance Certificate; and a copy of the building permit application, signed by
the plan check engineer, shall be required by the School District to verify the scope of the work.
Provide a dimension for the projection of the eave.
Any projection with the 5 foot fire separation distance has to be i-hr on the underside. See table R302.1 of the IRC.
Provide 1-hr construction between the new unit and the existing unit. Please note all supporting members for the 1-hr rated horizontal assembly must be supported by fire rating construction.
Provide an approved 1-hour construction detail, (show approval number) .
The wall separating the two units must have an STC rating of 50. Provide an approved detail to show compliance.
Engineer of record to sign structural plans.
Provide lateral bracing under the wall along line 2 on first floor.
Provide shear transfer detail that will transfer the load from the roof to the footing along line 2.
Provide structural calcs to show capacity of floor diaphragm to transfer the offset forces between the two floors.
Provide title 24 calcs.
This project need to comply with the California green building code. Provide notes and details to show compliance.
Provide fire rated construction underneath the stairway.