HomeMy WebLinkAbout248823_2_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10198569
PROJECT ADDRESS:
1251 E Dyer Rd
PLAN CHECK ENGINEER:
Chehade, NabilTEL:714
647-5848FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B, SPK
OCCUPANCY CLASSIFICATION(S):
N/A
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
1/16/2019
INITIAL REVIEW
1/23/2019
EXPIRATION
7/15/2019
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Tanner Henderson
3.
TEL:
(949)212-9880
FAX:
VALUATION:$339,000.00
EMAIL:
thenderson@ice-energy.com
FLOOD ZONE:X-0602320278J
APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5848 for an appointment.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Police Department approval on the corrected/final set of drawings (647-5840)
7. Please provide details and calcs for the 14 gauge curb, clarify the sizes of the members of the curb ( are they box tubes or metal studs? In addition, check their capacity to transfer the load from the unit to the roof structure.
In the calcs it was demonstrated that the posts are adequate to support the weight of the IB unit; however, the load from the unit is transferred to the post through the 14 gauge metal curb, the purlins and the Glu lam beam. Please justify the adequacy of all the components to support the proposed loads.