HomeMy WebLinkAbout248022_4_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10198338 PROJECT ADDRESS: 2909 S Tech Center Dr PLAN CHECK ENGINEER: Heidari, FredTEL:714 647-5862FAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): B, F-1, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 11/13/2018 INITIAL REVIEW 12/5/2018 EXPIRATION 5/12/2019 RECHECKS: 1. 02-11-2019 PROJECT APPLICANT CONTACT PERSON: 2.02-27-2019 Wojciech Smolenski 3.03/11/2019 TEL: (714)756-1581 FAX: VALUATION:$1,081,270.00 EMAIL: Tek@reservelifestyle.com FLOOD ZONE:X-0602320278J A recheck of your drawings was completed this morning, 03/11/2019; and items # 3, 10, & 33 from the original comments listed below are not done/ completed at this time. Another recheck of your drawings was completed this morning, 02-27-2019; and none of items from the second plan check are done/ completed. PLEASE RESUBMIT THE DRAWINGS BACK TO THE CITY FOR RECHECK ONLY WHEN ALL THE ITEMS LISTED BELOW ARE COMPLETED. A recheck of your drawings was completed this morning, 02-11-2019; and the following items from the original plan check list are not done/ completed. See the list below for item #3, 6, 10, 33, 38, & 45. Please see the comment for each item in the body of list below. APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Please resubmit the marked up architectural drawings to City for recheck.Resubmit 3corrected sets of plans.Only 2 sets were return to the City for recheck. Please bring in 3 complete sets of drawings for recheck.This item is not done/ completed at this time. Only 2 copies of the latest plans are submitted as of 03-11-2019. Please bring in 3 copies of the latest plan.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5862 for an appointment.The information under “project data” on sheet “T-1” refers the occupancies for this building as: “B”, F-1”, “S-1”, & “H-2” occupancy. If the “H-2” occupancy is not a typo, show compliance with CBC chapters 4, & 5 for this use. Plus, 2-Hours separation required between “H-2” and rest of the uses per Table 508-4.Provide lateral load analysis for the entire building. The submitted calculation is not adequate. This item is not done/ completed at this time.Provide structural calculation and construction details for securing the proposed 6 tanks on the second floor.Provide proper notes/ information for all “key notes” on the drawings.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:This item is not done/ completed at this time.The following items are incomplete as of 03-11-2019. - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Orange County Fire Authority approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - School District Compliance Certificate; a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of work. Refer to the attached handout. - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceOccupancies storing, handling, using, and/or selling hazardous materials, liquids, and chemicals shall submit a list of all said materials, listing their quantities and how they relate to specific California Building Code Table items. Note on the Floor Plan, type and quantity of hazardous material in each control area and fire-resistive rating for fire barriers.Provide typical section view detail of all new partitions and ceilings showing: - Size, spacing, and material of framing members - Note gauge and ICC Research Report number and installation/construction requirements for metal framing members. - It is the project designer’s responsibility to coordinate work with the various trades to ensure that the size of the wall cavity will be large enough to accommodate piping, fittings, ducts, etc. There has been a continuing field problem of 2½” wide metal studs not being able to accommodate plumbing pipes. - Heights of partition, suspended ceiling, structure above. - Fire-blocks and draft-stops in combustible construction in accordance with CBC Section 717. Show location(s) and provide typical construction details.Note on drawing: “Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort.”All doors require a level floor landing on each side in accordance with CBC Section1010. Provide typical door threshold details and details of change in floor covering material.The width of the level area on the side to which the door swings shall extend 24” past the strike edge of the door for exterior doors and 18” past the edge for interior doors. See red marks on sheets A-3 & A-4 of the drawings.Provide specifications for doors hardware (i.e., lever type, push-pull panic, etc) to comply with disabled access requirements.The floor or landing at each side of an exit door shall be level and having a length in the direction of the door swing of at least 60” and the length opposite the direction of door swing of 44” as measured at right angles to the plane of the door in the closed position.Hand-activated door opening hardware shall be centered between 34” and 44” above the floor. Latching and locking doors that are hand activated and which are in a path of travel shall be operable with a single effort by lever-type hardware, by panic bars, push-pull activating bars, or other hardware designed to provide passage without requiring the ability to grasp the opening hardware. Locked exit doors shall operate as above in egress direction.Note on the drawings: “Maximum effort to operate doors shall not exceed 5 pounds for exterior doors and interior doors, such pull or push effort being applied at right angles to hinged doors and at the center place of sliding or folding doors. Stairways shall show compliance with CBC Section 1011 and applicable disabled accessibility requirements of chapter 11B. - Provide complete architectural plan view, sections, details, and notes for stairway(s). - Dimension rise of steps shall be not less than 4” or greater than 7”. The run shall not be less than 11”. Provided detail 2/A-6 is missing some of these information.The upper approach and the lower tread of each interior stair shall be marked by a strip of clearly contrasting color at least 2” wide placed parallel to and close to (not more than 1” from) the nose of the step or landing to alert the visually impaired. The strip shall be of material that is at least as slip-resistant as the other treads of the stairs.Provide handrail details on the drawings showing compliance with CBC Section 1011 and chapter 11B. - Stairways shall have handrails on each side. - Handrails shall be 34 to 38” above the nosing of treads. - Handrails shall extend a minimum of 12” beyond the top nosing, and shall extend a minimum of 12” plus the tread width beyond the bottom nosing. Proposed new stair handrail is missing this code required handrail extensions. - Ends of handrails shall be returned or shall terminate in newel posts of safety terminals. - Handrails projecting from a wall shall have a space of 1½” between the wall and the handrail. - The handgrip potion of handrails shall not be less than 1¼” nor more than 2” cross-sectional dimension or the shape shall provide an equivalent gripping surface. The handgrip portion of handrails shall have a smooth surface with no sharp corners. CBC Section 1008.2.1, Requires means of egress from all occupied parts of the building be provided with at least 1’ candle of light at floor level. Show compliance on the drawings.Tactile exit signs shall be required at the following locations: - Each grade-level exterior exit door shall be identified by a tactile exit with the word “EXIT.” - Each exit door that leads directly to a grade-level exterior exit by means of a stairway or ramp shall be identified by a tactile exit sign with the following words as appropriate:“EXIT STAIR DOWN” - Each exit door that leads directly to a grade-level exterior exit by means of an exit enclosure, or an exit passageway, shall be identified by a tactile exit sign with the words “EXIT ROUTE.” - Each exit access door from an interior room or area to a corridor or hallway, which is required to have a visual exit sign, shall be identified by a tactile exit sign with the words “EXIT ROUTE.” - Each exit door through a horizontal exit shall be identified by a sign with the words “TO EXIT.”It is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards.Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Sections 11B-202.3, & 11B-202.4 : - An accessible entrance - An accessible route to the altered area - Accessible restrooms - Accessible telephone (if any) - Accessible drinking fountains, and - Parking, signage and alarmsSidewalks accommodating the disabled must be at least forty-eight inches (48”) wide and at least sixty inches (60”) where door swings over walk.If a walk crosses or adjoins a vehicular way, and the walking surfaces are not separated by curbs, railings or other elements between the pedestrian areas and vehicular areas, the boundary between the areas shall be defined by a continuous detectable warning which is 36” wide, complying with the CBC Section 11B247.Provide parking space identification in accordance with CBC Section 11B208 &11B-502 including: - Each parking space reserved for persons with physical disabilities shall be identified by a reflecting sign permanently posted immediately adjacent to and visible from each stall or space, consisting of a profile view of a wheelchair with occupant in white on dark blue background. The sign shall not be smaller than 70 square inches in area and, when in path of travel, shall be posted at a minimum height of 80” from the bottom of the sign to the parking space finished grade and shall be un-obscured by a parked vehicle. Signs may also be centered on the wall at the interior end of the parking space. An additional sign or additional language below the symbol of accessibility shall state “Minimum Fine $250.” - An additional sign shall also be posted in a conspicuous place at each entrance to off-street parking facilities, or immediately adjacent to and visible from each stall or space. The sign shall not be less than 17” by 22” in size with lettering not less than 1” in height, with clearly and conspicuously states the following:Unauthorized vehicles parked in designated accessible spaces not displaying distinguishing placards or license plates issued for persons with disabilities may be towed away at owner’s expense. Towed vehicles may be reclaimed by telephoning the Santa Ana Police Department at (714) 245-8665. CVC 22658a. - Provide assurance on the drawings that existing signage language reflects the paragraph above.Note on the drawings hot water and drain pipes under lavatory shall be insulated.Show compliance with CBC Section 11B-904.4 for the reception counter. (shallhave a section of counter that is at least 36” long and no more than 28 to 34” high).Show/note ventilation requirements on the plans in accordance with the CBC and California Mechanical Code (CMC) requirements for each type of use. Note on drawings: - All enclosed portions of buildings customarily occupied by human beings shall be provided with natural ventilation by means of openable exterior openings readily controllable by building occupants, with an area not less than 4% of the floor area being ventilated. - Provide mechanical ventilation for each area/room in accordance with the 2016 California Mechanical Code.This building is subject to the State of California Energy Conservation Regulations:This item is not done/ completed at this time.This item is not done as of 03-11-2019. - The permit applicant shall be responsible for obtaining an energy plan check from a consultant who is qualified to perform an energy efficiency analysis in accordance with the California Code of Regulations (CCR,) Title 24, Par 6, 2016 California Energy Code. The plan check consultant must sign documentation certifying that a thorough, competent review has been performed on behalf of the Enforcement Agency. - The corrected/final ARCHITECTURAL drawings shall have the required energy efficiency compliance documentation with completed signature blocks filed on the plans. The same information may be copied on the Electrical Plans for the Electrical Plan Checker. - Provide cool roofing as required by 2016 Energy Standards. - The energy plan check consultant must complete the attached “Energy Conservation Plan Check Consultant Qualification Statement.” - Refer to the attached information sheet.Provide a complete suspended ceiling system plan and section detail showing the following: - Vertical supports - Seismic wires - Seismic strut/Compression strut - Perimeter wires - Separate fixture wires for lights and mechanical devices - ICC Research Report number for the suspended ceilingThe design floor dead loads shall take into the account the weight of “light weight concrete over the floor sheathing”.See sheet A-7.All the floor steel beams are designed with assumption that beams are “fully braced against lateral-torsional buckling”, but details 11 & 12/SD2 do not show this condition. The beam’s “Lu” shall be checked and the plans shall be updated to show compliance.The shared wall between this building and the building # 6 shall be checked for additional loads.Provide structural calculations and drawings, stamped and signed by a California licensed architect or registered civil engineer for: - With the proposed second floor addition, provide lateral load analysis for the entire building. The submitted calculation is not adequate.This item is not done/ completed at this time. - Stairway(s). - Handrail(s)/guard(s). . - Change in floor use/loading. The existing floor area shall be checked for proposed live load of 125 PSF. - Storagetanks - New mechanical equipment on roof (note on Roof Framing Plan weight of each existing and new piece of equipment on the roof) - New equipment screening on roof - Any other structural alterationWind design data. The following information related to wind loads shall be shown, regardless of whether wind loads govern the design of the lateral-force-resisting system of the building: - Basic wind speed (3-second gust), miles per hour (km/hr). - Wind importance factor, I, and occupancy category. - Wind exposure. Where more than one wind exposure is utilized, the wind exposure and applicable wind direction shall be indicated. - The applicable internal pressure coefficient. - Components and cladding. The design wind pressures in terms of psf to be used for the design of exterior component and cladding materials not specifically designed by the registered design professional.Earthquake design data. The following information related to seismic loads shall be shown, regardless of whether seismic loads govern the design of the lateral-force-resisting system of the building: - Seismic importance factor, I, and occupancy category. - Mapped spectral response accelerations, SS and S1. - Site class. - Spectral response coefficients, SDS and SD1. - Seismic design category. - Basic seismic-force-resisting system(s). - Design base shear. - Seismic response coefficient(s), CS. - Response modification factor(s), R. - Analysis procedure used.Where the live loads for which each floor or portion thereof of a commercial or industrial building is or has been designed to exceed 50 psf, such design live loads shall be conspicuously posted by the owner in that part of each story in which they apply, using durable signs. It shall be unlawful to remove or deface such notices.Calculations must be presented in a clear, legible, and organized manner conducive for structural plan review. A table of contents must be provided and pages must be numbered for referencing purposes. Resubmit revised calculations showing compliance.A key plan must be provided for the structural members designed on all pages of calculations so that the calculations and plans may be correlated.A correlated grid system must be provided on the structural calculations and drawings to facilitate plan review process.See other red marks on the drawings. Please resubmit the marked up set with revised and updated plans for recheck.Please return the architectural marked up set to City for recheck.