Loading...
HomeMy WebLinkAbout250631_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10199139 PROJECT ADDRESS: 3770 W McFadden Ave Unit# F PLAN CHECK ENGINEER: Chehade, NabilTEL:714 647-5848FAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): M PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 2/7/2019 INITIAL REVIEW 2/24/2019 EXPIRATION 8/6/2019 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Rick Roswall 3. TEL: (619)297-0131 FAX: VALUATION:$105,653.70 EMAIL: rroswall@sgpa.com FLOOD ZONE:X-0602320256J APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Resubmit 2corrected sets of plans.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039)Please remove the dotted line that indicates the area of work from the plans to make sure all exit doors are shown on the construction drawings.Clarify the use of the narrow area next to the exterior wall, is their any platform there?Specify which of the counters provided have the proper height for accessibility?Provide dimension of the bathroom to show compliance with the accessibility requirements.