PLAN CHECK NO:
10199493
PROJECT ADDRESS:
2349 N Siemon St
PLAN CHECK ENGINEER:
Chehade, NabilTEL:714
647-5848FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3, U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
3/19/2019
INITIAL REVIEW
4/11/2019
EXPIRATION
9/15/2019
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Chuc Nguyen
3.
TEL:
(949)394-6605
FAX:
VALUATION: $54,400.00
EMAIL:
cichnguyen@gmail.com
FLOOD ZONE: X-0602320144J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2016 California Residential Code (CRC); 2016 California Building Code (CBC); CMC = 2016 California Mechanical Code; CPC = 2016 California Plumbing Code; CEC = 2016 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5848 for an appointment.
This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
-Public Works Agency approval (647-5039).
-Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
- School District Compliance Certificate; and a copy of the building permit application, signed by
the plan check engineer, shall be required by the School District to verify the scope of the work.
Dimension the distance to the back of the property line.
Provide window designation on floor plan.
Provide an emergency escape window for bedroom # 3 of the main house and for bedroom, one and the family room of the ADU. Specify the clear opening and height above floor of emergency escape.
Show a profile of the height of the attic and the location of the heater in the attic. Make sure there is ample height in the attic space to accommodate a heater. Also, show equipment layout in the attic, with respect to attic access.
Call out the specific location for the Simpson narrow wall at the patio.
The narrow Simpson wall need to be supported by a grade beam due to induced moment.
Dimension depth of all footings.
Provide a cross reference to a holdown detail that will be placed in the existing house.
Call out any special inspection requirements.
Provide support for the Dutch hip in both the existing house and the ADU, currently the plans show one support in the middle. A complete support for the hip and valley should be provided.
Provide a clear section that shows a ridge board, rafter, ceiling joists system; otherwise, design the ridge board as a ridge beam.