HomeMy WebLinkAbout252018_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10199542
PROJECT ADDRESS:
1241 S Grand Ave
PLAN CHECK ENGINEER:
Chehade, NabilTEL:714
647-5848FAX:714
647-5897
TYPE OF CONSTRUCTION:
III B
OCCUPANCY CLASSIFICATION(S):
A-3, B
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
3/25/2019
INITIAL REVIEW
4/8/2019
EXPIRATION
9/21/2019
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Tasia Kallies
3.
TEL:
(310)270-0430
FAX:
VALUATION:$15,000.00
EMAIL:
TKallies@Burnhamnationwide.com
FLOOD ZONE:X-0602320276J
APPLICABLE CODE: 2016CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5848 for an appointment.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Police Department approval on the corrected/final set of drawings (647-5840)
Provide a statement on plans as to the scope of work under this project.
Specify the existing type of construction of the building and the proposed use and occupancy.I am not sure if the lift is a part of this project as it is shown as new work but not listed on the application.These comments apply of the lift is a part of this project: Provide a floor plan to show that the proposed work is not obstructing any of the exits, in addition to the areas that are being served by the lift.note that the use of the lift as part of an accessible means of egress is limited by code. You might want to consult with an architect for requirements.
Please note all new work need to comply with the accessibility requirements.