Loading...
HomeMy WebLinkAbout252298_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10199633 PROJECT ADDRESS: 3333 S Bristol St PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812FAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): M PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 4/1/2019 INITIAL REVIEW 4/13/2019 EXPIRATION 9/28/2019 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Victor Moreno 3. TEL: (661)333-3949 FAX: VALUATION:$51,200.00 EMAIL: vic@towerpowerinc.com FLOOD ZONE: APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSubmit a signed copy of the contract showing labor and materials for all work to be done under the subject building permit application. The plan check engineer may accept the contract price as the valuation of improvements for unique/unusual projects in lieu of using a cost per square foot basis.Please note type of the business on the drawings.Provide the following: - Provide a fully dimensioned site plan on each set of plans. - Disabled access compliance must be shown on the site plan.Please enlarge path of travel from parking to show compliance with accessibility.Show location of doors on the site plan (Entrance door and Back door)CBC Section 11B-404.2.9 Note on the drawings: “Maximum effort to operate doors shall not exceed 5 pounds for exterior doors and interior doors, such pull or push effort being applied at right angles to hinged doors and at the center place of sliding or folding doors. Compensating devices or automatic door operators may be utilized to meet the above standards. When fire doors are required, the maximum effort to operate the door may be increased to the minimum allowable by the appropriate administrative authority, not to exceed 15 pounds.Relocate fire extinguisher to provide 12” clearance at the back door and also 18” clearance for the tactile sign .Tactile exit signs shall be required at the following locations: - Each grade-level exterior exit door shall be identified by a tactile exit with the word “EXIT.” - Each exit door that leads directly to a grade-level exterior exit by means of an exit enclosure, or an exit passageway, shall be identified by a tactile exit sign with the words “EXIT ROUTE.” - Each exit access door from an interior room or area to a corridor or hallway, which is required to have a visual exit sign, shall be identified by a tactile exit sign with the words “EXIT ROUTE.” - Each exit door through a horizontal exit shall be identified by a sign with the words “TO EXIT.”It is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards.Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Section 11B-202.4 - An accessible entrance - An accessible route to the altered area - Accessible restrooms - Accessible telephone (if any) - Accessible drinking fountains, and - Parking, signage and alarmsSanitation facility toilet room floors shall have a smooth, hard, non-absorbent surface such as Portland cement, concrete, ceramic tile or other approved material which extends upward onto the walls at least 6”. Walls within 2’ of the front and sides of urinals and water closets shall be similarly finished to a height of 4’.CBC Section 11B-606.5. Note on the drawings hot water and drain pipes under lavatory shall be insulated.Ensure sanitary facilities comply with CBC Section 11B-603.3 and that the bottom of the mirror is no higher than 40” from the floor.Drinking fountains serving the area of new work shall be accessible. CBC Section 11B-602 and California Plumbing Code Section 406.5.Provide Hi-low drinking fountain and show compliance with accessibility.CBC Section 11B-220.2,: NUMBER OF REGULARNUMBER TO BE CHECKSTANDSACCESSIBLE 1 to 41 5 to 82 - In new and existing construction, accessible check stands shall provide a clear checkout aisle width of 36” with a maximum adjoining counter height not exceeding 38” above the finish floor. - The top of the counter lip shall not exceed 40” above the finish floor. - Accessible check stands shall always be open to customers with disabilities and shall be identified by a sign clearly visible to those in wheelchairs. The sign shall display the international symbol of accessibility in white on a blue background and shall state “This check stand to be open at all times for customers with disabilities.”Complete the attached Disabled Accessibility Documentation Form.Show type and size of the water heater and provide seismic strap detail.Provide ICC report and span table for metal studs.