HomeMy WebLinkAbout252844_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10199810 PROJECT ADDRESS: 1951 E Dyer Rd Bldg# A PLAN CHECK ENGINEER: Chehade, NabilTEL:714 647-5848FAX:714 647-5897 TYPE OF CONSTRUCTION: IB OCCUPANCY CLASSIFICATION(S): A3, S2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 4/16/2019 INITIAL REVIEW 6/12/2019 EXPIRATION 10/13/2019 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Lisa Zoscak 3. TEL: (949)493-9548 FAX: VALUATION:$90,000.00 EMAIL: lisa@aquatictechnologies.com FLOOD ZONE:X-0602320278J APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5848 for an appointment.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039)Structural engineer of record and architect of record to review pool plans and stamp as no exception taken.The block wall that is shown by others need to be a part of these plans. Provide a block wall detail and method of attachment to the existing slab.The health department must approve the pool plans.A fixed lift must be available for each of the pool and the spa. Currently the plan show an insert, I am not sure if the intension is to use one lift for both a practice that is no longer code compliance.Provide proper details to show that the location of the lift is per section 11B-1009. Provide all the details to show proper compliance. This is a fire rated building, the use of foam as a structural component contradict with the type of construction. Any use of foam as a structural component( supporting the deck should be justified and plans stamped by structural engineer and project architect.