Loading...
HomeMy WebLinkAbout251322_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10199335 PROJECT ADDRESS: 2800 N Main St PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812FAX:714 647-5897 TYPE OF CONSTRUCTION: N/A OCCUPANCY CLASSIFICATION(S): N/A PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 3/1/2019 INITIAL REVIEW 3/16/2019 EXPIRATION 8/28/2019 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Jose Tabarez 3. TEL: (949)629-8838 FAX: VALUATION:$30,000.00 EMAIL: jtabarez@maxgen.com FLOOD ZONE:X-0602320163J APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.All persons preparing plans, specifications, and instruments of service for others shall sign those plans, specifications and other instruments of service for others shall sign those plans, specifications and other instruments of service and all contracts therefore. This requirement applies to both exempt and non-exempt projects. Business and Professions Code Chapter 3, Division 3, Section 5536.1(a).The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceShow EV station is in compliance with section 11B-812.Show operable parts are in compliance with section 11B-309.“Provide Van accessible and standard accessible electric vehicle charging station per table 11B-228.3.2.1Provide accessible route per 11B-812.5Provide detail for accessible EV charging station per 11B-812.6.1 and 11B-812.6.2Provide clear floor space at EV equipment per 11B-612.3 (minimum 30”x48”)