Loading...
HomeMy WebLinkAbout253379_2_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10199972 PROJECT ADDRESS: 1408 N Flower St PLAN CHECK ENGINEER: Chehade, NabilTEL:714 647-5848FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 5/1/2019 INITIAL REVIEW 5/12/2019 EXPIRATION 10/28/2019 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Alexander M Janecek 3. TEL: (310)989-3104 FAX: VALUATION: $20,000.00 EMAIL: Ajanecek@jlengineers.com FLOOD ZONE: X-0602320144J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2016 California Residential Code (CRC); 2016 California Building Code (CBC); CMC = 2016 California Mechanical Code; CPC = 2016 California Plumbing Code; CEC = 2016 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5848 for an appointment. This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. Provide a statement as to the scope of work under this permit.(Statement should be on the plans) Provide a floor plan.(show the proposed work on the floor plan) Provide smoke detector and Carbon monoxide alarm. The jack stud supporting the new beam is designed such as that it is laterally braced in both direction. The unbraced length is not zero in both direction. Please justify or modify. Label and dimension foundation plan.