Loading...
HomeMy WebLinkAbout249209_3_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10198677 PROJECT ADDRESS: 3301 S Harbor Blvd Unit# 109 PLAN CHECK ENGINEER: Chehade, NabilTEL:714 647-5848FAX:714 647-5897 TYPE OF CONSTRUCTION: VB OCCUPANCY CLASSIFICATION(S): F1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 12/13/2018 INITIAL REVIEW 4/2/2019 EXPIRATION 6/11/2019 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. John Satas 3. TEL: (714)605-6312 FAX: VALUATION:$100,000.00 EMAIL: Jsatas_associates@Yahoo.com FLOOD ZONE:X-0602320258J APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5848 for an appointment.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039)The floor plan shown on the architectural drawings is different than what is shown on the electrical plan.Dimension the existing bathrooms to show that they comply with the accessibility requirements. The layout shown for the standard bathroom differ from the existing bathrooms.Clarify if the wall where the proposed opening is to be made is a bearing wall. If so provide the propr header.The job description on the application calls for a security wall at the entrance; please clarify if such a wall is to be installed.The cooler plans should be on structural/architectural package. Provide the cooler approval number , UL, ICC etc and show method of attaching the walls to the floor and to the ceiling if applicable. Show distance between the ceiling of the space to the ceiling of the cooler.’The entrance to the cooler need to comply with the accessibility requirements, the door must have a min 32” clear with the door open, the hardware need to have lever type with a maximum force to open of 5 lbs.Provide a section showing the size and guage of the metal studs of the wall and the ceiling of the cooler unless the cooler has an ICC approval or equal.