Loading...
HomeMy WebLinkAbout254518_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 102100324 PROJECT ADDRESS: 1625 E St Gertrude Pl PLAN CHECK ENGINEER: Heidari, FredTEL:714 647-5862FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 6/5/2019 INITIAL REVIEW 6/17/2019 EXPIRATION 12/2/2019 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Marcus Kemmerer 3. TEL: (714)655-3139 FAX: (714)969-9059 VALUATION:$1,000.00 EMAIL: Marcus@kaarch.com FLOOD ZONE:X-0602320276J APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTSPlease indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5862 for an appointment.Clearly indicate the scope of work under this building permit application: - The scope of work for this permit is: legalizing the demo of 2 interior doors and an interior window. However, the “floor plan on sheet A1.2” in addition to above items, shows 3 new storage rooms and designation for 7 new windows. Please verify the scope of the work for this building permit and have the floor plan reflecting the work to be doneunder the subject building permit application. - Delete all notes and details from drawings that are not a part of the work to be done under the subject building permit application. This includes mechanical, plumbing and electrical work that is not specifically required by the Building Code.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceDrawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Chapter 11B: - An accessible entrance - An accessible route to the altered area - Accessible restrooms - Accessible telephone (if any) - Accessible drinking fountains, and - Parking, signage and alarmsThe sheet “A2.3” shall be upgraded to show compliance with CBC chapter 11B. See the red marks on this sheet.