Loading...
HomeMy WebLinkAbout255903_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101100759 PROJECT ADDRESS: 2911 S Tech Center Dr PLAN CHECK ENGINEER: Heidari, FredTEL:714 647-5862 EMAIL: fHeidari@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): B, M, S-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 7/15/2019 INITIAL REVIEW 7/18/2019 EXPIRATION 1/11/2020 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Paul Fulbright 3. TEL: (949)783-0727 FAX: VALUATION: $10,000.00 EMAIL: paul@fraarchitects.com FLOOD ZONE: X-0602320278J APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTSResubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5862 for an appointment.This review does not include mechanical or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (647-5840) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceProvide structural calculations and drawings, stamped and signed by a California licensed architect or registered civil engineer for: - New mechanical equipment on roof (note on Roof Framing Plan weight of each existing and new piece of equipment on the roof) - New equipment screening on roof if it is required by Planning Division, - Provide calculation for the lateral loads of the new HVAC and provide construction details to show how this unit will be secured to the roof framing to resist these loads.