Loading...
HomeMy WebLinkAbout255903_3_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101100759 PROJECT ADDRESS: 2911 S Tech Center Dr PLAN CHECK ENGINEER: Heidari, FredTEL:714 647-5862 EMAIL: fHeidari@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): B, M, S-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 7/15/2019 INITIAL REVIEW 7/18/2019 EXPIRATION 1/11/2020 RECHECKS: 1. 08/05/2019 PROJECT APPLICANT CONTACT PERSON: 2. 08/21/2019 Paul Fulbright 3. TEL: (949)783-0727 FAX: VALUATION: $10,000.00 EMAIL: paul@fraarchitects.com FLOOD ZONE: X-0602320278JA review of your drawings was completed this morning, 08-21-2019; and they are approved for building permit issuance subject to“- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuance”.The approved drawings are placed at the plan check counter for your convenience. A review of your drawing was completed today, 08/05/2019; and item # 4 is not done at this time. For item # 6, calculation submitted calls for “HDU2” at each end of the proposed 600 pond Heat pump. However, the drawing does not clearly show how to install this “HDU2” and what does this connect to. Revise detail: 1/S-2 TO CLEARLY SHOW PROPOER CONNECTION OF THIS HARDWARE TO TRANSFER THE LOADS FROM THE HEAT PUMP TO ROOF FRAMING MEMBERS. APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTSResubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5862 for an appointment.This review does not include mechanical or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (647-5840) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceProvide structural calculations and drawings, stamped and signed by a California licensed architect or registered civil engineer for: - New mechanical equipment on roof (note on Roof Framing Plan weight of each existing and new piece of equipment on the roof) - New equipment screening on roof if it is required by Planning Division, - Provide calculation for the lateral loads of the new HVAC and provide construction details to show how this unit will be secured to the roof framing to resist these loads.