Loading...
HomeMy WebLinkAbout255423_3_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 103100598 PROJECT ADDRESS: 1508 N Sycamore St PLAN CHECK ENGINEER: So, AnsonTEL:714 647-5830FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 6/26/2019 INITIAL REVIEW 7/7/2019 EXPIRATION 12/23/2019 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Thanh Nguyen 3. TEL: (562)567-4830 FAX: VALUATION:$2,000.00 EMAIL: Ablinvestmentsllc@gmail.com FLOOD ZONE:X-0602320163JINSTRUCTIONS FOR PROCEEDING WITH THE PLAN CHECK (PC) PROCESS: Review corrections on this Plan Check Correction Sheets, on the plans, and calculations. For any questions related to these PC corrections, email or call the Plan Check Engineer. See contact information above. Provide a written response or reference to details pursuant to the corrections. Any revisions on the plans shall be identified as part of your responses. Submit the original checked set of plans and calculations, three corrected set of plans, two corrected set of structural calculations, and this plan-check correction sheets to the Building Department. Unprepared responses with incomplete plans or calculations will delay plan check process. Once all the items have been corrected to comply with the code requirements and clearances are obtained, the building permit will be ready to be issue.IMPORTANT ITEMS TO READ: Your early attention is suggested to the approval process from other Departments as listed in the Plan Check Checklist due to possible delays resulting from a public hearing or other processes required by other Departments. The Planning Department, Public Works Agency, Police Department, Orange County Fire Agency, and others may have requirements that could significantly affect the final design of the project. The permit application will expire 12 months from the plans submittal date. This review does not include mechanical, electrical, plumbing work (MEP). Separate applications, fees, and permits are required for MEP work. Please be advised that the permit will be issued upon verification of compliance with the corrections included herein. The approval of plans does not permit the violation of any section of the Building Code, or other ordinance or state law. Numbers in parenthesis refer to particular code sections of the 2016 edition of the California Building Code (CBC). ADMINISTRATION: Obtain all clearancesfromthe following departments listed below. It is necessary to apply immediately for the signoff as it can take months for some departments to review the project. Comply with all conditions given during approval prior to building permit issuance. ☒PlanningDivision approval on the final set of drawings (714-647-5804). Applicant is responsible to ensure the final set of drawings are stamped by the Planning Division. ☒Public WorksDepartment’s approval (714-647-5690) if project valuation exceeds $30,000, or has added plumbing fixtures, or added bedrooms, or exceeds 500 square foot. ☐ Grading Permit - Application is made through the Building Safety Division (714-647-5800) and the plan review is by the Public Works Agency (714-647-5690). ☒ Police Department approval on the final set of drawings. (647-5840). ☐Fire Department approval on the final set of drawings (714-647-5839) ☐School District Compliance Certificate; and a copy of the building permit application, signed by the plan reviewer, shall be required by the School District to verified the scope of work. The building permit must be signed by the property owner or licensed contractor or authorized agent at the time the building permit is issued: For owner-builder permits: Owner’s signature can be verified with owner’s driver license or other forms of valid ID. Owner’s representative must present owner’s approval with a copy of driver license or other forms of valid ID from the owner. For contractor building permits: Prior to the issuance of a building permit, the contractor shall have the following: Letter of authorization for agents. Certificate of workers Compensation Insurance made out to the Contractors State License Board. Copy of Contractor’s State License or pocket ID. Copy of City of Santa Ana business tax registration certificate or a newly paid receipt. Two sets of plans will be required during building permit issuance. Plans must be: Quality blue or black line drawings with uniform and light background color. Maximum 36” x 48” size with minimum 1/8” lettering size. Minimum 18” x 24” size with minimum 1/8” lettering size. Sticky back details must produce prints without contrasting shades of background color. For new buildings and additions, one additional copy of only architectural set is required for the County Tax Assessor. (California Revenue and Taxation Section 72). Applicant is responsible to ensure the final set of plans are stamped by:☒ Planning Department ☒ Building Department ☒ Police Department ☐ Orange County Fire Authority Sheet A-1 Shower in toilet rooms shall be accessible in commercial buildings. See the following building code sections and provide all required accessible design features of the toilet room and shower room design on the plan.