Loading...
HomeMy WebLinkAbout247274_3_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10198107 PROJECT ADDRESS: 1306 3/4 W Second St Unit# WCC01 PLAN CHECK ENGINEER: Chehade, NabilTEL:714 647-5848FAX:714 647-5897 TYPE OF CONSTRUCTION: N/A OCCUPANCY CLASSIFICATION(S): U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 10/23/2018 INITIAL REVIEW 12/5/2018 EXPIRATION 4/21/2019 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Kris Stapleton 3. TEL: (657)444-7808 FAX: VALUATION:$25,000.00 EMAIL: corepermitting@gmail.com FLOOD ZONE:X-0602320257J APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5848 for an appointment.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process.. - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSpecify the type of construction of the building.Provide details and specifications for the installation of the FRP panels. Please show size thickness and method of attachment to existing structure.( elevations call for a new FRP panel behind the antennas, I don’t see it anywhere else on the plans ; no details has been provided to clarify that.