PLAN CHECK NO:
101101530
PROJECT ADDRESS:
1625 E St Gertrude Pl
PLAN CHECK ENGINEER:
Heidari, FredTEL:714
647-5862
EMAIL:
fHeidari@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B, SPK
OCCUPANCY CLASSIFICATION(S):
B, S-2
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
10/25/2019
INITIAL REVIEW
11/5/2019
EXPIRATION
4/22/2020
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Marcus Kemmerer
3.
TEL:
(714)655-3139
FAX:
(714)969-9059
VALUATION: $5,000.00
EMAIL:
FLOOD ZONE: X-0602320276J
APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5862 for an appointment.Please return marked up set of drawings with corrections.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2016 California Building Standards Code with local amendments.Clearly indicate the scope of work under this building permit application:
- Revise project job description on the building permit application worksheet to reflect the work to be done
under the subject building permit application.The application for permit indicates: “ (N) Mechanical”. However, the drawings show 2 mechanical equipment plus, walls, doors. Please remove these items to make plans matching the application for permit.
- Construction drawings must clearly show all work to be done under the subject building permit application.
- Delete all notes and details from drawings that are not a part of the work to be done under the subject building
permit application. This includes mechanical, plumbing and electrical work that is not specifically required by
the Building Code.All drawings and supporting documents shall be prepared, stamped and signed by a California licensed architect or registered civil engineer.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Orange County Fire Authority approval on the corrected/final sets of drawings ((714)573-6100)
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSubmit a signed copy of the contract showing labor and materials for all work to be done under the subject building permit application. The plan check engineer may accept the contract price as the valuation of improvements for unique/unusual projects in lieu of using a cost per square foot basis.Show on the plans:
- Project Address/Suite/Room Numbers; Building Numbers
- Occupancy Classification(s). City records do not show “M” occupancy classification for this building. Please modify the cover sheet, “T-1” by removing the “M” occupancy and the retail from this sheet.
- Type of ConstructionProvide fire blocking in concealed spaces of stud walls and partitions, including furred spaces at the ceiling and floor level and at 10 ft. intervals both vertical and horizontal.Provide typical section view detail of all new partitions and ceilings showing:
- Size, spacing, and material of framing members
- Method of attaching framing to the building structure. Compliance shall be shown with CBC Chapter 16 for lateral support of the walls. Submit structural engineering calculations for walls in rooms with a floor to building structure above height greater than 14’.
- Heights of partition, suspended ceiling, structure above.
- Fire-blocks and draft-stops in combustible construction in accordance with CBC. Showlocation(s) and provide typical construction details.Provide number of exits required by CBC Section 1006.Egress shall not pass through kitchens, storage rooms, closets or spaces used for similar purposes.Exiting from any occupied point in a building or structure on the subject site must be continuous, unobstructed, and undiminished to a public way. This includes gates which must show compliance with CDB Section 1010.Provide on the drawings a complete door schedule, showing:
- Door sizes
- Hardware complying with exiting and disabled accessibility requirements“Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort.”The floor or landing at each side of an exit door shall be level and having a length in the direction of the door swing of at least 60” and the length opposite the direction of door swing of 44” as measured at right angles to the plane of the door in the closed position.Regardless of the occupant load, there shall be a floor or landing on each side of a door. The floor or landing shall be not more than ½” lower than the threshold of the doorway. Change in level between ¼” and ½” shall be beveled with a slope no greater than 1:2. Change in level greater than ½” shall be accomplished by means of a ramp. Provide detailed sections and plan views showing compliance at all doorways requiring accessibility.Hand-activated door opening hardware shall be centered between 34” and 44” above the floor. Latching and locking doors that are hand activated and which are in a path of travel shall be operable with a single effort by lever-type hardware, by panic bars, push-pull activating bars, or other hardware designed to provide passage without requiring the ability to grasp the opening hardware. Locked exit doors shall operate as above in egress direction.Note on the drawings: “Maximum effort to operate doors shall not exceed 5 pounds for exterior doors and interior doors, such pull or push effort being applied at right angles to hinged doors and at the center place of sliding or folding doors. The bottom 10” of all doors except automatic and sliding shall have a smooth uninterrupted surface to allow the door to be opened by a wheelchair footrest without creating a trap or hazardous condition.CBC Section 1008.2.1, Requires means of egress from all occupied parts of the building be provided with at least 1’ candle of light at floor level. Show compliance on the drawings.Tactile exit signs shall be required at the following locations:
- Each grade-level exterior exit door shall be identified by a tactile exit with the word “EXIT.”
- Each exit door that leads directly to a grade-level exterior exit by means of an exit enclosure, or an exit
passageway, shall be identified by a tactile exit sign with the words “EXIT ROUTE.”
- Each exit access door from an interior room or area to a corridor or hallway, which is required to have a visual
exit sign, shall be identified by a tactile exit sign with the words “EXIT ROUTE.”
- Each exit door through a horizontal exit shall be identified by a sign with the words “TO EXIT.”Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Section 11B-202:
- An accessible entrance
- An accessible route to the altered area
- Accessible restrooms
- Accessible telephone (if any)
- Accessible drinking fountains, and
- Parking, signage and alarmsEntrance(s) to the building or facility and primary path of travel to the specific area of new work, alteration, structural repair or addition shall be accessible. Path of travel incorporated all elements from the exterior arrival site to remodeled area.If a walk crosses or adjoins a vehicular way, and the walking surfaces are not separated by curbs, railings or other elements between the pedestrian areas and vehicular areas, the boundary between the areas shall be defined by a continuous detectable warning which is 36” wide, complying with the CBC Section 11B247.Sanitary facilities serving the area of new work shall be disabled accessible. Revise the drawings to show compliance with CBC Section11B-604.Provide completely dimensioned floor plans, elevations and sections of sanitary facility insuring wheelchair clearances complying with CBC Section 11B-604 and the California Plumbing Code.Provide structural calculations and drawings, stamped and signed by a California licensed architect or registered civil engineer for:
- New mechanical equipment on roof (note on Roof Framing Plan weight of each existing and new piece of
equipment on the roof)
- New equipment screening on roof if it is required by Planning Division.Calculations must be presented in a clear, legible, and organized manner conducive for structural plan review. A table of contents must be provided and pages must be numbered for referencing purposes. Resubmit revised calculations showing compliance.A key plan must be provided for the structural members designed on all pages of calculations so that the calculations and plans may be correlated.