HomeMy WebLinkAbout259047_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101101792
PROJECT ADDRESS:
1 E MacArthur Pl Unit# 120
PLAN CHECK ENGINEER:
Heidari, FredTEL:714
647-5862
EMAIL:
fHeidari@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
I A, SPK
OCCUPANCY CLASSIFICATION(S):
B
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
10/10/2019
INITIAL REVIEW
10/21/2019
EXPIRATION
4/7/2020
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Jenna Cleaver
3.
TEL:
(949)608-3716
FAX:
VALUATION: $91,387.00
EMAIL:
jcleaver@saaia.com
FLOOD ZONE: X-0602320278J
APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5862 for an appointment.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceNote on drawing: “Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort.”All doors require a level floor landing on each side in accordance with CBC. Provide typical door threshold details and details of change in floor covering material for proposed new double door in the storefront of reception area.The floor or landing shall be not more than ½” lower than the threshold of the doorway. Change in level between ¼” and ½” shall be beveled with a slope no greater than 1:2. Change in level greater than ½” shall be accomplished by means of a ramp. Provide detailed sections and plan views showing compliance at this new doorway.Hand-activated door opening hardware shall be centered between 34” and 44” above the floor. Latching and locking doors that are hand activated and which are in a path of travel shall be operable with a single effort by lever-type hardware, by panic bars, push-pull activating bars, or other hardware designed to provide passage without requiring the ability to grasp the opening hardware. Locked exit doors shall operate as above in egress direction.Note on the drawings: “Maximum effort to operate doors shall not exceed 5 pounds for exterior doors and interior doors, such pull or push effort being applied at right angles to hinged doors and at the center place of sliding or folding doors. The bottom 10” of all doors except automatic and sliding shall have a smooth uninterrupted surface to allow the door to be opened by a wheelchair footrest without creating a trap or hazardous condition.Provide sanitary facilities to serve this altered area. Or, provide assurance that the existing building bathroom in the building is accessible to the occupant of this space at all the times.Glass and glazing shall be in accordance with Section 2406.4.2 of CBC. Note on the drawings all windows and doors having glazing. Indicate the type and thickness of each light of glazing on the drawings.Show compliance for the window in the reception area which is near the door # 100