HomeMy WebLinkAbout259181_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101101842
PROJECT ADDRESS:
1517 3/4 N Fairview St Unit# WCC01
PLAN CHECK ENGINEER:
Ahangian, KathyTEL:714
647-5812
EMAIL:
Kahangian@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
N/A
OCCUPANCY CLASSIFICATION(S):
U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
10/15/2019
INITIAL REVIEW
10/27/2019
EXPIRATION
4/12/2020
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Alexander Lew
3.
TEL:
(714)729-8404115
FAX:
VALUATION: $20,000.00
EMAIL:
corepermitting@gmail.com
FLOOD ZONE: X-0602320144J
APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceExposure category for city of Santa-Ana is “C”, please revise calculations accordingly.On structural Analysis report please note and certify sufficient capacity for a) Footing, b) Base plate c) pole after adding and replacing branches.