Loading...
HomeMy WebLinkAbout259613_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101102014 PROJECT ADDRESS: 3 E Hutton Center Dr PLAN CHECK ENGINEER: Heidari, FredTEL:714 647-5862 EMAIL: fHeidari@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: I A, SPK OCCUPANCY CLASSIFICATION(S): S-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 10/28/2019 INITIAL REVIEW 11/5/2019 EXPIRATION 4/25/2020 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Frank Alamo 3. TEL: (951)256-0958 FAX: VALUATION: $28,000.00 EMAIL: frank.alamo@abm.com FLOOD ZONE: X-0602320278J APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5862 for an appointment.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2016 California Building Standards Code with local amendments.It is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards.Show compliance with CBC Section 11B-228.3.1, “where EVCS are provided, EVCS shall be in accordance with Section 11B-228.3”.Show compliance with CBC Section 11B-228.3.1.2 for operating parts.Show compliance with CBC Section 11B-228.3.2.1 for minimum number of public use and common use EVCS per Table 11B-228.3.2.1.Show compliance with CBC Section 11B-812.3 for floor and ground surface.Show compliance with CBC Section 11B-812.4 for vertical clearance.Show compliance with CBC Section 11B-812.5 for accessible route.Show compliance with CBC Section 11B-812.5.4 for arrangement of these EVCS.Show compliance with CBC Section 11B-812.6 for vehicle spaces.Show compliance with CBC Section 11B-812.6.1 for van accessible space.Show compliance with CBC Section 11B-812.7 for access aisle.Show compliance with CBC Section 11B-812.7.2 for marking the EVCS.Show compliance with CBC Section 11B-812.70.3 for lettering of “NO PARKING”.Show compliance with CBC Section 11B-812.8 for identification signs.Show compliance with CBC Section 11B-812.9 for surface marking.All drawings and supporting documents shall be prepared, stamped and signed by a California licensed architect or registered civil engineer.This review does not include electrical work. Separate plan, application, fee, plan check, and permitis required for electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceProvide the following: - Provide a site plan on each set of plans and show location of proposed CVCS on the site plan.. - Disabled access compliance must be shown on the site plan.Show on the plans: - Occupancy Classification(s) - Type of ConstructionIt is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards.