PLAN CHECK NO:
101100063 (FUEL CANOPY ONLY)
PROJECT ADDRESS:
813 N Euclid St
PLAN CHECK ENGINEER:
Heidari, FredTEL:714
647-5862FAX:714
647-5897
TYPE OF CONSTRUCTION:
IIB
OCCUPANCY CLASSIFICATION(S):
M
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
6/6/2019
INITIAL REVIEW
7/2/2019
EXPIRATION
12/3/2019
RECHECKS:
1. 12/02/2019
PROJECT APPLICANT CONTACT PERSON:
2.
Tue (Tom) Huynh
3.
TEL:
(714)722-9302
FAX:
VALUATION:$86,040.00 ?
EMAIL:
tom@asidvm.com
FLOOD ZONE:A-0602320143J
A recheck of your drawings was completed this morning, 12/02/2019; and they are approved for building permit issuance subject to approvals listed under items # 11 from the list below.
The approved drawings are placed at the plan check counter for your convenience.
APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5862 for an appointment.Please return marked up set of drawings with corrections.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2016 California Building Standards Code with local amendments.Clearly indicate the scope of work under this building permit application:
- Revise project job description ( Summary of work) on the cover sheet ,(G0.0), to reflect the work to be done under the subject building permit application.ALL THE “G” SHEETS SHALL BE REMOVED FROM THIS DRAWING. THE BUILDING PERMIT APPLICATION IS FOR INSTALLING A 53’ X 36’FUEL CANOPY ONLY.
- Construction drawings must clearly show all work to be done under the subject building permit application.
- Delete all notes and details from drawings that are not a part of the work to be done under the subject building
permit application. This includes mechanical, plumbing and electrical work that is not specifically required by
the Building Code.All drawings and supporting documents FOR THIS CANOPY shall be prepared, stamped and signed by a California licensed architect or registered civil engineer.Include address and telephone number of the responsible designer, and date of signing of drawings.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Orange County Fire Authority approval on the corrected/final sets of drawings ((714)573-6100)
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)
- Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by
the Public Works Agency (647-5039)
- County of Orange Health Department approval on the corrected/final set of drawings ((714)433-6000)
- School District Compliance Certificate; a copy of the building permit application, signed by the plan check
engineer, shall be required by the School District to verify the scope of work. Refer to the attached handout.
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSubmit a signed copy of the contract showing labor and materials for all work to be done under the subject building permit application. The plan check engineer may accept the contract price as the valuation of improvements for unique/unusual projects in lieu of using a cost per square foot basis.The valuation of improvements for the subject building permit application has been calculated to be $300,000.00.Provide pedestrian protection in accordance with CBC Section 3306. Show location and type of protection on plan view. Provide typical construction details, sections, and elevations of pedestrian protection required. Pedestrian protection constructed within a public right of way shall require a building permit issued by the Building Safety Division and a separate approval from the City’s Public Works Agency (714) 647-5039.Provide the following:
- Provide a fully dimensioned site plan on each set of plans.
- Disabled access compliance must be shown on the site plan.
- Show all property lines of record and the assumed property line between the canopy and the building on the site plan. Show compliance with CBC Table705.8 of these drawings.Show on the plans:
- Complete legal description
- Assessor’s Parcel Number
- Project Address/Suite/Room Numbers; Building Numbers
- Occupancy Classification(s)
- Type of Construction
- Fire Sprinkler System This project is in a special flood hazard area designated on the flood insurance rate map (FIRM) as zone A. This zone requires that the lowest finish floor elevation (including basement) of the structure shall be at (or above) base flood elevation determined by a hydrology study for the A zone, on the flood insurance rate map. All elevations must be referenced to the National Geodetic Vertical Datum. Reference should be made to the Flood Plain Management Ordinance, Santa Ana Municipal Code, Chapter 7, for complete requirements. Drawings shall show compliance with said ordinance including noting flood zone and finish floor elevation.
Note on Plans: A Federal Emergency Management Agency National Flood Insurance Program ELEVATION CERTIFICATE shall be completed by a California Licensed Land Surveyor or California Registered Civil Engineer who is authorized to practice land surveying. The completed ELEVATION CERTIFICATE must be submitted to the Building Inspector at the time of foundation inspection, and a final certificate must be submitted at the time of final inspection.Provide structural calculations and drawings, stamped and signed by a California licensed architect or registered civil engineer for:
- Canopy. The calculation submitted is for a canopy size of 90’ X 20’ however, the drawing shows a 53’ X 36’ size canopy. Also, all the Soils report recommendations shall be incorporated in the drawings.Calculations must be presented in a clear, legible, and organized manner conducive for structural plan review. Resubmit revised calculations showing compliance.A key plan must be provided for the structural members designed on all pages of calculations so that the calculations and plans may be correlated.