Loading...
HomeMy WebLinkAbout260790_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101102363 Revision to 10195780 PROJECT ADDRESS: 401 N Bush St PLAN CHECK ENGINEER: Heidari, FredTEL:714 647-5862 EMAIL: fHeidari@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): A-3, B, R-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 11/27/2019 INITIAL REVIEW 12/10/2019 EXPIRATION 5/25/2020 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Jeff Beddow 3. TEL: (949)722-7400 FAX: (949)722-8855 VALUATION: EMAIL: jeff.saproperties@gmail.com FLOOD ZONE: X-0602320276JAll items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5862 for an appointment.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2016 California Building Standards Code with local amendments and to clearly indicate the scope of work under this building permit application. There may be additional requirements when complete construction drawings and supporting data is submitted for Building Safety Division review.The proposed revised sheet “SD1” does not include thedetails form the original set of drawings that were on this sheet. Is this a typo? Please clarify.Provide full architectural and structural sheets for this revision. All revision items shall be properly clouded on these sheets.The original building permit set, sheet “A3.01”, does not include a large opening on the lower left side of proposed detail 1/SD1. Please clarify this opening. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval is required for any exterior revision to the building. - Police Department approval on the corrected/final set of drawings (647-5840). -Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.