HomeMy WebLinkAbout260979_2_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101102429
PROJECT ADDRESS:
300 E Fifth St
PLAN CHECK ENGINEER:
Heidari, FredTEL:714
647-5862
EMAIL:
fHeidari@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
I B
OCCUPANCY CLASSIFICATION(S):
S-2
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
12/4/2019
INITIAL REVIEW
12/12/2019
EXPIRATION
6/1/2020
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Harrison Palmer
3.
TEL:
(619)961-3973
FAX:
VALUATION: $500,000.00
EMAIL:
hpalmer@tesla.com
FLOOD ZONE: X-0602320276J
APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5862 for an appointment.This review does not include electrical work. Separate plan, application, fee, plan check, and permitis required for electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Orange County Fire Authority approval on the corrected/final sets of drawings ((714)573-6100)
- Public Works Agency approval (647-5039)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceIt is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards.Since the locations of these EVCS are on the 3rd floor of this existing parking garage, please make a clear note on the drawings for compliance with CBC Section 11B-812.4. (Minimum vertical clearance of 98” is required for: van accessible vehicle space, access aisles serving them, and vehicle routes.)Show compliance with CBC Section 11B-812.7.1 for access aisle for the van accessible stall to be located on the passenger side of the vehicle. See red marks on sheets “C-5” &”C-11”.Also, since there is no accessible route in front of the accessible vehicle, show compliance with CBC Sections 11B-812.5.2 & 11B-812.10.4. The access aisle or the accessible vehicle space shall be switched for the standard accessible stall so that access to the charger will be maintained. See red marks on sheet “C-11”.