PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101103203
PROJECT ADDRESS:
101 N Harbor Blvd Unit# 107
PLAN CHECK ENGINEER:
Lee, WayneTEL:714
647-5848
EMAIL:
wlee@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B, SPK
OCCUPANCY CLASSIFICATION(S):
B
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
2/19/2020
INITIAL REVIEW
4/10/2020
EXPIRATION
8/17/2020
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Dan Popa
3.
TEL:
(949)923-6905
FAX:
(949)923-6190
VALUATION: $525,000.00
EMAIL:
dan.popa@stantec.com
FLOOD ZONE:
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.Sheet A0.1. Please clarify the building site plan:Remove “for reference only” from the drawing title: “Site plan-for reference only”.Remove unavailable site plan notes which do not apply to this permit. The permitted accessible parking spaces and EV charging stations to be shown on plan.Show location of the proposed tenant unit 107 on plan.Show all property lines.Show a proposed accessible path of travel from the public streets to the unit 107 accessible entrance.Show a proposed accessible path of travel from the nearest accessible parking space to the unit 107 accessible entrance.Sheet A0.1. Under “reference only” notes, please update the building shell permit number. Per city’s record, the building shell permit number is 101101549.Sheet A0.7. Under “code analysis”. Update the construction type to V-B from V-A per city’s record for the shell building.Sheet A2.1. There are missing notes and dimensions on detail 1, 2 and 3. Provide complete information on plan.GREENSheet A0.5a, A0.5b and A0.5c. Plans shall indicate method of verification of compliance with all CALGreen requirements per 2019 version of CALGreen. Third party or other methods shall demonstrate satisfactory conformance with mandatory measures.STRUCTURALSheet A1.4.1. Detail 2. Provide seismic design for the compression post connection to the bottom of the floor. Provide structural calculation and specify mechanical fasteners.Sheet A2.0. Detail 1. Provide top brace detail at the partition wall of the wall type WO and WM. Cross-reference the structural connection details to the sections. Some details are referenced to sheet A5.8 which is not available. Please revise.Structural calculation page 20. Provide anchorage design for item #3 (cash recycle anchorage). Verify if the anchorage in detail 4/S3.2 is adequate. Structural calculation page 25. Provide anchorage design for item #4 (V3.0-ATM anchorage). Verify if the anchorage in detail 2/S3.2 is adequate.Sheet S2.3. Detail 2/S6.3 is not available. Provide applicable detail for condenser platform construction.***Note that all red lines on plan have been addressed in this comment letter. It is optional to pick up the plans, but not required. Have a nice day***