HomeMy WebLinkAbout263846_2_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101103351
PROJECT ADDRESS:
2630 W Segerstrom Ave Unit# F
PLAN CHECK ENGINEER:
Lee, WayneTEL:714
647-5848
EMAIL:
wlee@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-2
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
3/3/2020
INITIAL REVIEW
3/30/2020
EXPIRATION
8/30/2020
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Martin Garcia
3.
TEL:
(714)595-1479
FAX:
VALUATION: $13,200.00
EMAIL:
Mg21construction@gmail
FLOOD ZONE: X-0602320259J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made.
This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.
All red marks on the plan have been indicated on the following comments. It is not required to pick up checked plans. You may fix corrections without picking up checked plans:
Sheet S-1. Under “design assumptions”, revise deck dead load to 15 psf per structural calculation.
Sheet S-1. Under “general requirements”, revise note #5 to show compliance codes are 2019 version.
Sheet S-2. Detail D/S4 is not available at the separation wall. Please clarify.
Sheet S-3. Revise elevation to show minimum 42” high guardrail, measured from the deck surface to the top of the rail.Sheet S-4. Detail A/S4. Specify fasteners for sill plate anchorage at the bottom of the separation wall.