Loading...
HomeMy WebLinkAbout264694_1_Corrections.docxSPC PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101103572 PROJECT ADDRESS: 2200 S Yale St Bldg# A PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: N/A OCCUPANCY CLASSIFICATION(S): N/A PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 5/5/2020 Roof Top PV system INITIAL REVIEW 5/18/2020 EXPIRATION 11/1/2020 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Joe Belmont 3. TEL: (949)793-5544 FAX: VALUATION:$100,000.00 EMAIL: dennishurtado009@yahoo.com FLOOD ZONE:X-0602320258J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS General Comments / Instruction All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039). Sheet T1:Scope of work: Separate permit application and plan sets are required for each building. Please revise scope of work to show/specify the correct amount of panels and optimizers for one building (136 panels & 70 Optimizers). System Size: Please revise system size (kW) for one building (building A).Array Information: For clarity and consistency – please show information for only one building (building A). Please revise job address to specify building ‘A’, apply to all plan sheets. Sheet A & E1:For clarity, please omit information showed on building B, or state “PV system on building B is under a separate permit”. Plan must be legible. Please increase font size and contrast. Sheet S1: Please clarify where is this roof layout occurred? Remove information if it does not apply to the project. There are two plan sheets ‘S1’ – please renumber as necessary. Sheet S3Please clarify where this is applicable. Clearly cross-reference detail onto the plan. Structural CalculationThe job address (location) stated in the calculation was not accurate. Please revise job address accordingly.