Loading...
HomeMy WebLinkAbout265507_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101103783 / 84 PROJECT ADDRESS: 1261 E Dyer Rd PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 6/10/2020 INITIAL REVIEW 6/15/2020 EXPIRATION 12/7/2020 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Sheila P Andelin 3. TEL: (949)233-0484 FAX: VALUATION: $20,000.00 / $62,040.00 EMAIL: O3Design@aol.com FLOOD ZONE: X-0602320278J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS General Requirement & Instruction All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Please return marked up set of drawings with corrections, if it was picked up.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039)Sheet T1:Scope of work: For clarity, please list 1st Floor Restrooms; 2nd Floor Restrooms; and 2nd Floor Corridor, each with a statement describing the specify improvement. Sheet Index: Electrical, Mechanical and Plumbing – Please note it’s under a separate review and approval. Sheet HC2.1:First Floor Dimensional Plan: Women’s Restroom – Please show/provide minimum 44” clear access leading to the accessible toilet compartment. Second Floor Dimensional Plan: Women’s Restroom – Please show/provide minimum 44” clear access leading to the accessible toilet compartment. Sheet A2:One door was eliminated at Suite 210 and Suite 220. Please provide egress plan with means of egress, including occupant load calculation and travel distance, for Suite 210 and Suite 220. Door Schedule: Doors at openings along the corridor – Please specify doors with smoke seal. Sheet A3:New air Register over the rated corridor: Please provide/specify mechanism of air-handling system shut down upon activation of the air-handling unit smoke detector required by the California Mechanical Code.