HomeMy WebLinkAbout267462_1_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101104321
PROJECT ADDRESS:
1714 S Lyon St
PLAN CHECK ENGINEER:
Le, TungTEL:714
647-5896
EMAIL:
Tle10@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
B, F-1, S-1
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
8/14/2020
INITIAL REVIEW
9/1/2020
EXPIRATION
2/10/2021
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Robert Pinault
3.
TEL:
(714)632-9441
FAX:
VALUATION: $15,000.00
EMAIL:
robert@rdpinaultcompany.com
FLOOD ZONE: X-0602320276J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.General & Approval RequirementAll items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
Sheet CS
General Notes: Please update note to reflect and reference to the 2019 Code edition.
NPDES Control notes: Please provide emergency contact phone number.
Table of Contents: CalGreen Notes plans – Remove plans from plan submittal sets if information provided are not applicable to the proposed project.
Sheet A-1: On the plan, please show location of new roll-up door will be installed, and clarify whether the wall opening was existing or new.
On the plan, please specify the size of the roll-up door.
Sheet A-3:
Roof plan: It appears that there are more rooftop equipment provided on the roof. Please verify and show all roof top equipment on the plan.
Please provide/show roof access.
Structural Review Comments:
Please provide structural support and attachment of the proposed roll-up door.
Sheet S1: For clarity, please show spacing for the screen bracings.
Structural calculation page 1: Brace wind force – Please clarify why the load is divided by 2.