HomeMy WebLinkAbout266198_2_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101103951
PROJECT ADDRESS:
724 E Dyer Rd
PLAN CHECK ENGINEER:
Le, TungTEL:714
647-5896
EMAIL:
Tle10@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B, SPK
OCCUPANCY CLASSIFICATION(S):
B, F-1, S-1
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
7/1/2020
INITIAL REVIEW
7/22/2020
EXPIRATION
12/28/2020
RECHECKS:
1.9/9/2020 2nd submittal
PROJECT APPLICANT CONTACT PERSON:
2.
Roberto Bejarano
3.
TEL:
(323)816-3980
FAX:
VALUATION: $45,000.00
EMAIL:
bejaranosconstruction@gmail.com
FLOOD ZONE: X-0602320278J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
General & Approval:
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714)573-6100)
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)Submit a letter addressed to the Building Safety Division describing in detail the manufacturing process from material delivery, storage, handling, packaging, and shipping of finish product. Include an equipment list describing use in the process.2nd Review Comment: No response provided. Please comply with the comment above. Reminder: Final plan shall be stamped, signed and dated by a licensed architect. Sheet A101:As part of mean of egress and accessible route, a pedestrian gate is required at the sliding gate. 2nd Review Comment: New gate – gate shall be accessible to persons with disabilities. Provide gate hardware complying with Section 11B-404.2.7 thru 11B-404.2.9, and provide elevation to show compliance with Section 11B-404.2.10. Truncated dome provided at the exterior exit doors (exit 2): Please revise plan to show truncated dome wrap around the door maneuver space. 2nd Review Comment: Please revise plan to show dimension of the 5-ft maneuver space. Sheet A301:New roof top units: Please provide structural framing and details for roof top unit support and attachment. Provide calculation. 2nd Review Comment: No response provided. Please comply with the comment above.