Loading...
HomeMy WebLinkAbout267899_1_Corrections.docxSPC PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101104484 PROJECT ADDRESS: 3620 3/4 S Bristol St Unit# WCC01 PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 8/28/2020 INITIAL REVIEW 9/10/2020 EXPIRATION 2/24/2021 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Danny Krivak 3. TEL: (949)336-1550 FAX: VALUATION:$25,000.00 EMAIL: dkrivak@coastalbusinessgroup.net FLOOD ZONE:X-0602320259J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTSThis review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714) 573-6100).Sheet T1. Revise scope of work to add structural framing alteration to this permit. (The structural alteration shown on sheet S1 and S2 require building permit).STRCUTURALSheet S1Provide structural calculation for roof framing alteration and connections shown on sheet S1.Provide specification for roof diaphragm. Specify the spacing between rafters to support the diaphragm. What is the space between three Lx6x3/8 FRP joists?Verify the diaphragm span does not exceed the maximum allowable span between rafters.Provide connection details to show load path for the lateral force originated from the roof diaphragm to the vertical lateral force resisting system (e.g. shear wall). Specify type of hardware, bolts or nailing to transfer shear load between members in the connection details.Provide calculation to justify existing 2x6 ceiling joists is capable to support the ridge beam C6 x 1 11/16 x 3/8 FRP.Provide more information in connection detail E showing how the ridge beam C6 x 1 11/16 x 3/8 FRP is supported to the existing roof framing member.Per detail F, provide calculation for the 4x8 beam and show location and vertical support, connection details of this beam on the framing plan.Provide ICC number for new FRP faux firberglass Spanish tiles on plan.Provide ICC number for durashieldtonge grove FRP panels by Strongwell on plan.