Loading...
HomeMy WebLinkAbout266449_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101104019 PROJECT ADDRESS: 2840 S Croddy Way PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): B, F-1, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 7/9/2020 INITIAL REVIEW 7/23/2020 EXPIRATION 1/5/2021 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Sami Pakbaz 3. TEL: (626)727-8900 FAX: VALUATION: $600,000.00 EMAIL: spakbaz@infrastructurearchitects.com FLOOD ZONE: X-0602320258J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker. Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used. Resubmit 2 corrected sets of plans. Please return marked up set of drawings with corrections. This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information. The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714) 573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) Submit a letter addressed to the Building Safety Division describing in detail the manufacturing process from material delivery, storage, handling, packaging, and shipping of finish product. Include an equipment list describing use in the process. Please note on plan: All cannabis facilities shall provide odor mitigation in accordance with Mechanical Code and City Handout. Sheet A0-1: Building Area summary: Please list/specify the floor area of the proposed T.I, and clearly identify which areas are under separate permit. Please see Site Plan and Floor Plan. Sheet Index: Mechanical, Electrical and Plumbing – Please note “Under a Separate Review”. Sheet A-05: Please show exit sign for the second exit out of the open office area. Travel distance for single exit shall be limit to 100-ft maximum. Exit access through the processing area, storage area or similar room shall be prohibited. Please revise plan accordingly. Sheet AD2.1: On the plan, please clearly identify building address number for each suite. Sheet A1-0: On the plan, please provide/show an accessible path of travel from the public sidewalk to the building primary entrances and to the area of alteration/improvement. The accessible path of travel shall be 5% maximum sloped, measured in the direction of travel, and 2% maximum cross-slope. On the plan, please show concrete curb and curb ramp with detectable warning, where required. Please show/provide detectable warning between pedestrian area and vehicular area. Please show all required exit shall be unobstructed and continuous to the public way. Show egress path on the plan. Sheet A2-0: Wall Types referenced to sheet A8.1 for wall type and detail, but sheet A8.1 was not provided. Existing doors: Please provide door schedule for the existing doors and provide information for door hardware. Door shall be accessible to persons with disabilities. On the plan, please show/provide door maneuver space complying with Section 11B-404.2.4, on both sides of door. On the plan, please provide/show tactile exit sign at exit doorway. Cooler and freezer: Please provide construction details for the cooler and freezer room. Sheet A3.0: Please show exit sign on both side of door between open office area and “processing” area. Sheet A8-0: Enlarged restroom floor plan – Please show restroom door not encroach more than 12” into the turning circle. Enlarged restroom floor plan – please show minimum 60” floor clear space for the water closet, measured from the side wall to the edge of the sink. Sheet A9-0: Please provide door hardware. Please provide the following notes on the plan: Door Hardware – Egress doors/gates shall be readily openable from the egress ide without the use of a key or special knowledge or effort. (1010.1.9) Openable parts of such hardware shall be 34 inches minimum and 44 inches maximum above the finish floor or ground. The force for pushing or pulling open a door shall be 5-lb maximum. Operable parts shall be operable with one hand and shall not require tight grasping, pinching, or twisting of the wrist. Door V1: Please revise door elevation to show vision glazing locate not more than 43” above the finish floor. Main door: A readily visible durable sign posted on the egress side on or adjacent to the main exit door stating: “THIS DOOR TO REMAIN UNLOCKED WHEN THIS SPACE IS OCCUPIED”, is required. (1010.1.9.3) Sheet A10-0 & A10-1: Please clearly cross-reference details onto the plan. Delete/omit detail that does not apply to the project.