HomeMy WebLinkAbout266456_2_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101104021
PROJECT ADDRESS:
2844 S Croddy Way
PLAN CHECK ENGINEER:
Le, TungTEL:714
647-5896
EMAIL:
Tle10@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B, SPK
OCCUPANCY CLASSIFICATION(S):
B, F-1, S-1
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
7/9/2020
INITIAL REVIEW
7/27/2020
EXPIRATION
1/5/2021
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Sami Pakbaz
3.
TEL:
(626)727-8900
FAX:
VALUATION: $600,000.00
EMAIL:
spakbaz@infrastructurearchitects.com
FLOOD ZONE: X-0602320258J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714)573-6100)
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)Submit a letter addressed to the Building Safety Division describing in detail the manufacturing process from material delivery, storage, handling, packaging, and shipping of finish product. Include an equipment list describing use in the process.Please note on plan: All cannabis facilities shall provide odor mitigation in accordance with Mechanical Code and City Handout. Sheet A0-1:Building Area summary: Please list/specify the floor area of the proposed T.I, and clearly identify which areas are under separate permit. Please see Site Plan and Floor Plan. Sheet Index: Mechanical, Electrical and Plumbing – Please note “Under a Separate Review”. Sheet A-05:Veg. Room 131: The travel distance shall be measure to the furthest point of the occupied area – Please show travel distance from the top-right corner of the room. Exit access through the kitchen/break, storage room or similar room shall be prohibited. Please revise plan accordingly. Sheet A1-0:On the plan, please provide/show an accessible path of travel from the public sidewalk to the building primary entrances and to the area of alteration/improvement. The accessible path of travel shall be 5% maximum sloped, measured in the direction of travel, and 2% maximum cross-slope. On the plan, please show concrete curb and curb ramp with detectable warning, where required. Please show/provide detectable warning between pedestrian area and vehicular area.Please show all required exit shall be unobstructed and continuous to the public way. Show egress path on the plan.Sheet A2-0:Dry room: Drying room within a building shall be constructed entirely of approved noncombustible materials. Provide wall and ceiling details and clearly cross-reference details onto the plan. (417.1)Provide detail to show compliance with Section 471.2 for insulation and separation between adjacent walls. Provide details and clearly cross-reference details onto the plan. Please show dimension for the restroom hallway. Wall Types referenced to sheet A8.1 for wall type and detail, but sheet A8.1 was not provided. Existing doors: Please provide door schedule for the existing doors and provide information for door hardware. Door shall be accessible to persons with disabilities. On the plan, please show/provide door maneuver space complying with Section 11B-404.2.4, on both sides of door. On the plan, please provide/show tactile exit sign at exit doorway. Sheet A8-0:Enlarged restroom floor plan – Please show restroom door not encroach more than 12” into the turning circle. Enlarged restroom floor plan – please show minimum 60” floor clear space for the water closet, measured from the side wall to the edge of the sink.
Sheet A9-0:
Please provide door hardware.
Please provide the following notes on the plan:
Door Hardware –
Egress doors/gates shall be readily openable from the egress ide without the use of a key or special knowledge or effort. (1010.1.9)
Openable parts of such hardware shall be 34 inches minimum and 44 inches maximum above the finish floor or ground.
The force for pushing or pulling open a door shall be 5-lb maximum.
Operable parts shall be operable with one hand and shall not require tight grasping, pinching, or twisting of the wrist.
Main door: A readily visible durable sign posted on the egress side on or adjacent to the main exit door stating: “THIS DOOR TO REMAIN UNLOCKED WHEN THIS SPACE IS OCCUPIED”, is required. (1010.1.9.3)Sheet A10-0 & A10-1:Please clearly cross-reference details onto the plan. Delete/omit detail that does not apply to the project. Structural Calculation:Tank anchorage calculation: Please provide analysis for tanks when they are empty. Please check 7”x4” bracket base plate and its welding.