PLAN CHECK NO:
101103879
PROJECT ADDRESS:
705 N Linwood Ave
PLAN CHECK ENGINEER:
Lee, WayneTEL:714
647-5848
EMAIL:
wlee@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
6/22/2020
INITIAL REVIEW
7/31/2020
EXPIRATION
12/19/2020
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Arturo Gonzalez
3.
TEL:
(657)247-6396
FAX:
VALUATION: $10,000.00
EMAIL:
gplanos@sbcglobal.net
FLOOD ZONE: X-0602320163J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.All items noted on this plan check report must be addressed.
This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
PLAN CHECK COMMENTS:
Sheet 1. Provide emergency egress window/openings in the existing bedroom which is next to the new bathroom. The existing 3x4 sliding window does not comply.
Basements, habitable attics, and every sleeping room in dwelling units must have a window or exterior door for an emergency exit, sill height not more than 44 inches above the floor, 5.7 square feet of openable area, 24 inches clear opening height, 20 inches clear opening width and shall open directly into a public street, alley, yard, or exit court. (CRC R310.1-R310.1.3)
CAUTION: Using minimum clear openable height with the clear openable width will yield only 3.3 square feet and not the minimum 5.7 square feet required. Be especially careful with double-hung windows. Also, when the emergency escape window is below ground level refer to CRC Section R310.2 for additional requirements.
Sheet 1.Provide access to the under-floor space beneath the new bathroom addition area.The floor access shall be a minimum 18” by 24” and openings through a perimeter wall shall be not less than 16” by 24”. (CRC R408.4)
Sheet 1. Revise water flow to 1.8 gpm from 2.0 pgm for showerheads. (CGBC 4.303.1.3).
Sheet T-24.1. The CF-1R form is to be signed by the Document Author and Building Designer and incorporated into the plans. (T24-1-10.103(a) 2A).
Provide engineering structural calculation for wall bracing/shear walls by a licensed civil or structural engineer. Review and revise structural plans and connection details to match the calculation.
Sheet 3 detail 3. Revise length of #4 rebar from 12” to 24” minimum in the new concrete footing. (ACI318-14 section 25.4).
Sheet 3 detail 3. Specify type of reinforcement epoxy with ICC ESR number.
Sheet 3 detail 5. Revise detail to indicate edge nailing (E.N.) is required on the edge of the lower roof to provide load path for shear transfer. Minimum 2x blocking is required between studs for at the level where lag screw embedded.