HomeMy WebLinkAbout267772_2_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101104421
PROJECT ADDRESS:
1641 E St Andrew Pl
PLAN CHECK ENGINEER:
Lee, WayneTEL:714
647-5848
EMAIL:
wlee@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B, SPK
OCCUPANCY CLASSIFICATION(S):
B, S-1
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
8/26/2020
INITIAL REVIEW
9/9/2020
EXPIRATION
2/22/2021
RECHECKS:
1.10/15/2020
PROJECT APPLICANT CONTACT PERSON:
2.
Shannon Kita
3.
TEL:
(630)334-9340
FAX:
VALUATION: $60,000.00
EMAIL:
shannon.kita@apex-cos.com
FLOOD ZONE: X-0602320276J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTSThis review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714)573-6100)
- Public Works Agency approval (647-5039)PLAN CHECK COMMENTS:Provide a fully dimensioned site plan.Please show:Show all property lines of record for 1641 E St Andrew Pl on the site plan.Show accessible parking spaces on the site plan.Provide scope of work on the first page of the drawings. Indicate type, length and height of the storage racks to be installed.PC2: Revise the note title “response to plan check note #4” to “ scope of work” on the cover sheet.Provide a key plan showing the tenant space location where the storage racks to be installed within the existing building or floor.Show exit signs and emergency lighting location (identify new or existing) on plan.Provide information if the building is provided with fire sprinkler protection.PC2: Add note to cover sheet (sheet P00) that if this building is equipped with fire sprinklered.CBC Section 1705.12.7, Storage racks and access floors. Periodic special inspection is required during the anchorage of access floors and storage racks 8’ or greater in height in structures assigned to Seismic Design Category D, E or F.PC2: Sheet 02, 03 and 04. Revise seismic design category to D, E and F instead of S and F in the special inspection note.Note on the drawings locations and inscriptions of 50 square inch minimum size permanent plaques installed in conspicuous locations, showing the maximum permissible unit load in clear, legible print.Lower portions of posts exposed to damage by forklift trucks or other moving equipment shall have protective devices. If not so protected, at the option of the building official, the rack structure may: (1) be designed to maintain its full design load capacity at allowable stresses with the exposed post capacity reduced by one-half or (2) be designed to maintain its full design load capacity at 50 percent increased allowable stresses with the exposed post assumed to have no carrying capacity.PC2:Show compliance on plan prior to approval. Please provide protective device or provide calculation to justify on the design to comply with option 1 or option 2.Sheet P01. Provide legend to identify new or existing storage racks on plan.Sheet P01. On the floor plan, specify the clearance between Rack B2 and the nearest exterior wall. Provide 5.12” minimum separation distance per structural calculation page 32.Sheet P01. On the floor plan, each row of racks has specify different number of 3” posts. For example, the lowest racks (B1+B2) has (11) 3” posts. Please explain what does that mean?Provide the height of the items stored. (Measured from the floor to the top of the commodities that are stored).Please show panel height on the braced elevations between horizontal brace member “C” on each type of rack.STRUCTURAL CALCULATIONOn rack design, see page 2 for example, please explain why design live load is zero? For design support for gravity load combination, live load should be included. (RMI2.1 Live load: Live load other than the pallets or products stored on the racks). Please review design for all racks.Support of racks by foundations, concrete floor slabs or other means shall be in conformance with CBC Chapter 18. The plan shows the racks are supported directly on the slab. Please justify if the slab and soils are capable to support the load from each post.
PC2: There is no response to this item. Please response.New corrections per revised plans:Please submit 2 copies of the new structural calculation and drawings. Only one copy was submitted.Remove the building foundation plan if it is not part of this permit.
*** Plans with corrections for pick up is by appointment only and it is between Monday and Thursday between 9 am and 10 am. Please contact Wayne Lee by phone 714-647-5848 or email wlee@santa-ana.org to schedule plans pickup.***We accept plans drop off for correction resubmittals only (not revisions or change of scope). It is between 9 am and 12 pm from Monday through Thursday (No Friday). No appointment is needed. You can access to the drop-off location outside the building, located at the south entrance of the city hall by the information desk. Please call (714) 647-5800 for permit issuance and payment information, and for all building related questions or if you need assistance to find the drop-off location.