Loading...
HomeMy WebLinkAbout266198_3_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101103951 PROJECT ADDRESS: 724 E Dyer Rd PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): B, F-1, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 7/1/2020 INITIAL REVIEW 7/22/2020 EXPIRATION 12/28/2020 RECHECKS: 1.9/9/2020 2nd submittal PROJECT APPLICANT CONTACT PERSON: 2. Roberto Bejarano 3. TEL: (323)816-3980 FAX: VALUATION: $45,000.00 EMAIL: bejaranosconstruction@gmail.com FLOOD ZONE: X-0602320278J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS General & Approval: All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039)Submit a letter addressed to the Building Safety Division describing in detail the manufacturing process from material delivery, storage, handling, packaging, and shipping of finish product. Include an equipment list describing use in the process.2nd Review Comment: No response provided. Please comply with the comment above. Reminder: Final plan shall be stamped, signed and dated by a licensed architect. Sheet A101:As part of mean of egress and accessible route, a pedestrian gate is required at the sliding gate. 2nd Review Comment: New gate – gate shall be accessible to persons with disabilities. Provide gate hardware complying with Section 11B-404.2.7 thru 11B-404.2.9, and provide elevation to show compliance with Section 11B-404.2.10. Truncated dome provided at the exterior exit doors (exit 2): Please revise plan to show truncated dome wrap around the door maneuver space. 2nd Review Comment: Please revise plan to show dimension of the 5-ft maneuver space. Sheet A301:New roof top units: Please provide structural framing and details for roof top unit support and attachment. Provide calculation. 2nd Review Comment: No response provided. Please comply with the comment above.