HomeMy WebLinkAbout269090_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
102104893
PROJECT ADDRESS:
3121 S Oak St
PLAN CHECK ENGINEER:
Le, TungTEL:714
6475896
EMAIL:
Tle10@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
UnKnown
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
10/8/2020
INITIAL REVIEW
11/12/2020
EXPIRATION
4/6/2021
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Debra Pember
3.
TEL:
(714)334-8385
FAX:
(949)265-6959
VALUATION: $50,000.00
EMAIL:
debra@developersedge.com
FLOOD ZONE: X-0602320278J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Note on Plan: This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714)573-6100)
- Public Works Agency approval (647-5039)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSheet S1.1:Please provide the following information on the cover sheet – Scope shall be legible. Please increase font size. Specify construction shall comply with 2019 California Building Code, California Mechanical Code, California Electrical Code, California Plumbing Code, California Green Building Code, and California Energy Code. On the plan, please specify occupancy groups.On the plan, please specify type of construction.Building floor area for each occupancy.Site plan: Please clearly identify property line on the plan, street and north arrow. On the plan, please show/provide an accessible route from the public sidewalk and to building accessible primary entrance, and from accessible parking to the building entrance. Accessible path of ravel shall be 5% maximum slope and 2% cross-slope. On the plan, please show location and details of accessible parking. Details shall be clearly cross-reference onto the plan. On the plan, please show/provide detectable warning (truncated dome) where required. Please provide/show restrooms and show restrooms compliance with Chapter 11B, Division 6. Plan review will continue at time resubmittal. In case of using the 20% rule of accessible upgrade, a City Disable Access Compliance Form shall be completed and submitted for review and approval. On the plan, please show/provide storage racks information including dimensions and maximum height. Structural Review Comment:Provide structural details and calculation for the storage racks. On the plan, please specify maximum loading for the storage racks. A permanent placard each not less than 50 square inches in area and showing the maximum permissible unit load in clear and legible print will be displayed in one or more conspicuous locations at the discretion of the City’s inspector.Please provide calculation to check for existing slab supporting the dust collector.Please provide calculation to check for existing slab support the storage racks.