HomeMy WebLinkAbout264803_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101103603 PROJECT ADDRESS: 700 W Third St PLAN CHECK ENGINEER: Le, TungTEL:714 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): A-3, R-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 5/26/2020 INITIAL REVIEW 6/18/2020 EXPIRATION 11/22/2020 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Michael Santillan 3. TEL: (714)803-8454 FAX: VALUATION: $10.00 EMAIL: ms@msarchitects.us FLOOD ZONE: X-0602320257J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS General Comments & Instruction All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2 corrected sets of plans.Please return marked up set of drawings with corrections.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039)Sheet A-3:First Floor and Second Floor: the location of the stairway did not align with each other – Please clarify. Second Floor keynote #1: Deck exposed to weather and seal underneath shall be waterproof. On the plan, please specify manufacturer’s name and ICC report number of the waterproofing material.Provide structural framing plan and details for the replaced exterior deck and sheathing. Show deck framing and specify sheathing thickness and nailing schedule. Provide details and clearly cross-reference onto the plan. Second Floor Keynote #4: Please provide structural detail for the replaced floor sheathing and blockings. Specify floor sheathing thickness and nailing schedule. Second Floor: Detail A-4/1 called out at the window was not applicable. Please coordinate and revise detail reference accordingly.