Loading...
HomeMy WebLinkAbout268997_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101104862 PROJECT ADDRESS: 1712 E Newport Cir Unit# C PLAN CHECK ENGINEER: Lee, WayneTEL:714 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 10/12/2020 INITIAL REVIEW 10/30/2020 EXPIRATION 4/10/2021 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Bob Thompson 3. TEL: (714)232-1890 FAX: VALUATION: $5,000.00 EMAIL: bobthompsonoc@gmail.com FLOOD ZONE: X-0602320276J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTSSheet A-1. Revise the description of the scope of work to reflect the work to be doneunder the subject building permit application.Include address and telephone number of the responsible license engineer, and date of signing of drawings.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039)Sheet A-1. Revise the occupancy group to B/S-1 for the distribution facility.Sheet A-1. Provide a fully dimensioned site plan (in addition to the partial site plan) with the following: - Show all structures. - Disabled access compliance must be shown on the site plan. - Show all property lines of record on the site plan.Submit a letter addressed to the Building Safety Division describing in detail the manufacturing process from material delivery, storage, handling, packaging, and shipping of finish product. Include an equipment list describing use in the process.Sheet A-2. All legends are shown existing. Please clarify what are the proposed work items and label them with new or (N), if applicable.EXITSheet A-2. Revise the drawings to reflect under CBC Section 1010.1.9.4 Exception 2.2, which reads “THIS DOOR MUST REMAIN UNLOCKED WHENEVER THE BUILDING IS OCCUPIED.” This note applies to office door #1 and door #2.Sheet A-2. Note the following on the plans: “The means of egress, including the exit discharge, will be illuminated to a level of not less than one foot-candle at the walking surface at all times the building space served by the means of egress is occupied”.Sheet A-2. Note on plans: “Egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort.”END OF COMMENTS.