HomeMy WebLinkAbout267383_3_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101104306 PROJECT ADDRESS: 3400 W Segerstrom Ave PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: III B, SPK OCCUPANCY CLASSIFICATION(S): B, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 8/12/2020 INITIAL REVIEW 9/17/2020 EXPIRATION 2/8/2021 RECHECKS: 1.10/12/2020 PROJECT APPLICANT CONTACT PERSON: 2. Eric Liwski 3. TEL: (949)596-7362 FAX: VALUATION: $2,000,000.00 EMAIL: eliwski@synarcstudio.com FLOOD ZONE: X-0602320258J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS General / Approval Requirement All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039)Sheet A-0.00:Occupancy groups: Please clarify what type of ‘S’ occupancy classification of the proposed T.I. 2nd Review Comment: Occupancy separation complying with Table 508.4 is required between S-1 and S-2. Please reclassify occupancy groups or provide occupancy separation. Sheet A-1.01:Accessible route: referenced to the prior approved permit was insufficient. Please show an accessible route from the public sidewalk to the building primary entrance; and from the accessible parking stall(s) to the building entrance. 2nd Review Comment:Enlarged plan 2 on sheet A-1.01 – Please provide the following: Accessible ramp – Provide minimum 72” (6’-0”) intermediate landing of ramp, measured in the travel downward direction. Detectable warning (truncated dome) shall be provided along the “zero” curb face adjacent to the vehicular area. (See marked-up for location). New gate: Please provide detail for new gate, include size, elevation, hardware, smooth surface on the push side, etc. Structural Review Comment:Provide roof and ceiling framing plans. 2nd Review Comment: Sheet S-2.2, Girder Reinforcing Schedule – Please increase font size to be legible. Provide structural slab and details for the ground-mounted equipment.2nd Review Comment: Provide structural calculation and detail for the ground-mounted equipment (condensers).