HomeMy WebLinkAbout269721_1_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
102105088
PROJECT ADDRESS:
215 1/2 E Chestnut Ave
PLAN CHECK ENGINEER:
Le, TungTEL:714
647-5894
EMAIL:
Tle10@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3, U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
10/28/2020
INITIAL REVIEW
11/6/2020
EXPIRATION
4/26/2021
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Juan Pomalaza
3.
TEL:
(949)742-2395
FAX:
(714)866-4164
VALUATION: $30,000.00
EMAIL:
juancapomalaza@gmail.com
FLOOD ZONE: X-0602320276J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
-Police Department approval on the corrected/final set of drawings (647-5840).
-Public Works Agency approval (647-5039).
Please revise plans to show half (1/2) address.
Sheet C-S:
Please add the following note: All concealed work installed without permits must be exposed for inspection to the satisfaction of the Building Inspector.
CalGreen note: Please revise water flow rate for lavatory sink faucets to 1.2 gpm.
Sheet A-2:
On the plan, please show location of existing garage door opening to be infilled.
Keynote called out floor plan referred to sheet A1 for more information but information was not provided on sheet A1. Please provide information for keynotes.
Window W1 in bedroom: Please specify clear width and clearopening height and minimum opening area for emergency escape window.
Please provide building cross-section to show building envelope insulation, including wall and ceiling insulation.
Sheet A-4:
Plan shall be legible. Please increase font size and reprint the Green Code notes.
Structural Comments:
Detail 15/S3 called out at the interior structural wall was not applicable. Please provide detail to show ceiling and roof rafter run perpendicular to wall.
Please provide detail to show interior support for roof rafters (cripple walls and kickers).
Please clarify should wall between washer/dryer room and bathroom be a bearing wall. Provide footing if it’s a bearing wall.
Foundation plan:
On the plan, please clearly identify existing footing vs. new footing.
Detail 4/S-3: New footing shall be minimum 18” deep below finish grade.
Detail 16/S3: Please revise detail to show existing concrete slab with positive connection to new interior footing.
Provide detail for exterior post support. Show 8” separation between exposed grade (earth).
Please show holddown for shear wall at wall line B.
Provide detail for holddown anchor to footing. Clearly cross-reference detail onto the plan.