PLAN CHECK NO:
101104275
PROJECT ADDRESS:
502 S Cooper St
PLAN CHECK ENGINEER:
Le, TungTEL:714
647-5896
EMAIL:
Tle10@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3, U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
8/12/2020
INITIAL REVIEW
10/6/2020
EXPIRATION
2/8/2021
RECHECKS:
1.11/10/2020
PROJECT APPLICANT CONTACT PERSON:
2.
Michael Luna
3.
TEL:
(951)685-4418
FAX:
VALUATION: $12,000.00
EMAIL:
Manuelunafelix@hotmail.com
FLOOD ZONE: A-0602320252J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
Sheet A2: The building cross-section callout were mislabeled. Please coordinate and revise plan accordingly.
2nd Review Comment: Section 3/A2 – Please revise section to show/provide concrete curb at the patio wall.
Portal wall:
On the plan, please specify ICC listing number.
Provide complete Simpson portal spec sheets on the plan.
2nd Review Comment: Portal Frame with Hold-down (PFH) did not comply with Section 2308.6.5.2. Maximum Shear Wall Aspect Ratio shall comply with Table 4.3.4.