Loading...
HomeMy WebLinkAbout269972_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101105152 PROJECT ADDRESS: 200 S Elk Ln PLAN CHECK ENGINEER: Lee, WayneTEL:714 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: I A, III A, SPK OCCUPANCY CLASSIFICATION(S): A-3, B, R-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 1/11/2021 INITIAL REVIEW 1/27/2021 EXPIRATION 7/10/2021 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Debra Pember 3. TEL: (714)334-8385 FAX: (949)265-6959 VALUATION: $1,000,000.00 EMAIL: debra@developersedge.com FLOOD ZONE: X-0602320276J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). - Police Department approval on the corrected/final set of drawings (647-5840). - Public Works Agency approval (647-5039). PLAN CHECK COMMENTS: ARCHITECUTRAL Delete “not for construction” note on the title block on each drawing. Update the project address to “200 S. Elk Lane” on the title block on each drawing. Sheet LT.0. Provide the description of the scope of work on the plan, including all structural items. Sheet LT.0. List all under separate permit items as shown on this package. E.g. swimming pool and spa. Sheet LT.0. Provide a statement on the title sheet of the plans that this project shall comply with following codes: - 2019 California Building Code (CBC) - 2019 California Electrical Code (CEC) - 2019 California Mechanical Code (CMC) - 2019 California Plumbing Code (CPC) - 2019 California Green Building Standards Code (CGBS) or CALGreen - 2019 California Energy Code (CEnC) - City of Santa Ana Municipal Code Sheet LT.0. Identify the area of the scope on the site map. Clarify what are the dashed lines for? Clarify the fire pit design on the central courtyard. The referenced detail on sheet LC.8 appears not match the plan on LS.1 which does not have covered structure and CMU wall. Sheet LS.1. Cross-reference the “spa wall” information to the plan where the information can be found. Sheet LC.3. Add note to the detail that “Risers shall be 4 inches high minimum and 7 inches high maximum.” Remove or delete details which do not apply to this project. E.g. covered structure on sheet LC.9. STRUCTURAL Update the project address to “200 S. Elk Lane” on all structural sheets and the cover page of the structural calculation. Please update structural calculation to comply with 2019 CBC and ASCE 7-16. Provide structural calculation and details on the spa wall (referenced location on the site plan LS.1).