HomeMy WebLinkAbout269248_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101104944 PROJECT ADDRESS: 1703 1/3 W Pine St PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 10/14/2020 INITIAL REVIEW 11/6/2020 EXPIRATION 4/12/2021 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Araceli Maciel 3. TEL: (714)285-1121 FAX: VALUATION: $65,000.00 EMAIL: aadrafting@msn.com FLOOD ZONE: X-0602320257J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. -Police Department approval on the corrected/final set of drawings (647-5840). -Public Works Agency approval (647-5039). - School District Compliance Certificate; and a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of the work. Sheet A-1: Hand-written notes: please transfer hand-written notes onto electronic file prior to reprinting. Site plan: Please show surface drainage slope and pattern away from all buildings’ wall foundation walls. Sheet A-3: Roofing: Please specify minimum 2 layers of underlayment for roof slope less than 3:12. Structural comments: Sheet S-2: There was whiteout and ink notes – Reminder: Please transfer hand written notes onto to final plan. Detail 3/S-3: Please provide positive connection between precast concrete pier and cast in place concrete pad. Detail 6 and 8 on sheet S-3: Please revise details to show double walls (existing and new).