HomeMy WebLinkAbout268715_2_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101104759
PROJECT ADDRESS:
1811 N Greenleaf St
PLAN CHECK ENGINEER:
Le, TungTEL:714
EMAIL:
Tle10@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3, U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
9/25/2020
INITIAL REVIEW
10/19/2020
EXPIRATION
3/24/2021
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Bao D Pham
3.
TEL:
(909)538-7067
FAX:
VALUATION: $3,800.00
EMAIL:
bao@bdpeng.com
FLOOD ZONE: X-0602320163J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.General and approval requirementAll items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
-Public Works Agency approval (647-5039).
Sheet A-1:
Existing bedroom was altered: new window should meet the minimum clear opening for emergency escape. Please revise floor plan and elevation to provide 3’-6” x 4’-6” S.H window.
There was no permit record for the powder room. Please show fixture clearances for plumbing fixtures in the powder room. Minimum 24” clear floor space shall be provided in front of the water closet and vanity. Please coordinate and revise plan accordingly, including the scope of work.
Sheet A-2:
Building Section – Please show floor insulation (R-19) at the new addition.
Sheet A-3:
Please relocate the smoke and carbon monoxide alarm to the hallway giving access to the sleeping rooms.
Sheet S-1:
Please coordinate with architectural plan. Per building section on sheet A-2, there is raised foundation at addition restroom – Please coordinate and revise plan accordingly.